SCP-2122
Unknown
~
medium confidence
SCP-2122
Expected annual
$4.2M
One-time setup
$7.8M
Annual recurring
$4.2M
Personnel
36
Initial setup is capital-intensive (site acquisition, structural hardening, vault construction, robotic/remote systems, and contingency reserves) with large recurring personnel and operational expenses; main recurring drivers are security and specialized technical staff.
One-Time Capital Costs
Total: $7.8M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Normal uneventful year with routine maintenance, staffing, training, and low-level consumable replenishment.
no incidents
standard maintenance
no major activations
🚨
Minor Incident
$4.4M/yr
Localized incident (unauthorized activation or small leak) requiring targeted amnestic treatment, repairs, and investigation.
unauthorized activation
small leak or equipment failure
limited witness exposure
🚨
Major Breach
$5.2M/yr
Significant containment/operational breach requiring large-scale amnestics, emergency containment activation, legal/PR response and repairs.
breach or sustained unauthorized activation
extensive witness exposure
need for emergency reserve activation
🚨
Catastrophic Demolition
$7.2M/yr
Decision or requirement to fully neutralize/demolish the site/object with large-scale cover operations and demolition logistics.
infeasible in-situ containment
public exposure requiring demolition
ordered neutralization
Personnel
36 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | [#8] 24/7 armed security team with rotations and supervisors; count chosen to match the security wage envelope used in recurring estimates. |
| Containment Strike Team / Specialized Response | 8 | [#9] On-call specialized response team (tactical containment, memetic countermeasures); higher-pay specialists included in recurring wages. |
| Research Scientist / Engineer | 8 | [#10] Electrical engineers, anomalous-device specialists, containment engineers responsible for assessment, maintenance, and testing; headcount derived from technical-staff wage allocation. |
| Medical Officer | 2 | [#13] On-site medic/doctor and medevac readiness; headcount consistent with the medical salary budget. |
Confidence Notes
Detailed containment and operational notes allow reasonable bounding of costs, but broad ranges for staffing levels, contingency reserves, and rare catastrophic actions (demolition, large-scale amnestic operations) produce material uncertainty; many figures are mid-range estimates.