SCP-2461
Safe
~
medium confidence
SCP-2461
Expected annual
$5.9M
One-time setup
$49.2M
Annual recurring
$5.8M
Personnel
33
Initial establishment and hardening of Armed Containment Site 2461 is the dominant one-time expense (~$49.2M). Ongoing annual costs (~$5.85M baseline) are driven primarily by armed staffing, tactical readiness/equipment amortization, contingency reserves, and classified security/cover operations.
One-Time Capital Costs
Total: $49.2M
Annual Recurring Costs
Total: $5.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.8M/yr
Normal year with no major incidents; routine operations, staffing, maintenance, and reserve funding only.
routine_operations
scheduled_inspections
no_incident
🚨
Minor Incident
$6.2M/yr
Attempted theft, small containment failure, or equipment malfunction requiring short response and repairs.
attempted_intrusion
localized_equipment_failure
minor_contamination_event
🚨
Major Breach
$10.8M/yr
Large-scale containment breach or violent incident causing casualties, major asset loss or public exposure requiring major legal/operational response.
catastrophic_breach
public_exposure
major_fire_or_explosion
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#5] 24/7 armed guard shifts (3 shifts + spares) covering perimeter and access control. |
| Rapid Reaction Team / Tactical Response | 10 | [#6] On-call tactical operators with higher pay and specialized training. |
| Medical Officer | 2 | [#24] Onsite medics and part-time physician/counseling support. |
| Engineer / Maintenance | 4 | [#25] Engineers, electricians and janitorial/operations staff maintaining site systems. |
| IT / Cybersecurity | 2 | [#26] IT security and classified network administrators. |
| Administrative Staff / Site Director | 3 | [#17, #20, #21] Site director, administrative support, records manager for classified oversight and liaison. |
| Research Scientist | 0 | [#16, #30] Research is currently frozen (O5 moratorium); no on-site research staff budgeted. |
Confidence Notes
Estimates use midpoints of broad ranges in analyst notes; many line items (facility construction, legal settlements, and contingency reserves) have wide variability, and incident-driven costs are highly scenario-dependent, so confidence is medium.