SCP-2483
Euclid
~
medium confidence
SCP-2483
Expected annual
$5.9M
One-time setup
$13.2M
Annual recurring
$5.7M
Personnel
35
Initial capital and project spending are significant (multi-million-dollar) driven by reinforced isolation construction, heavy remote-manipulation equipment, and contingency reserves; ongoing annual operating costs are dominated by security staffing and research/R&D/monitoring budgets.
One-Time Capital Costs
Total: $13.2M
Annual Recurring Costs
Total: $5.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.7M/yr
Normal operational year without major incidents; routine containment, R&D, monitoring, and staffing costs only.
no breach
routine testing
no major equipment failure
🚨
Minor Incident
$6.1M/yr
Localized containment instability or documentation-corruption event requiring medical treatment, limited structural remediation, PR response and replacement equipment.
localized structural damage
one or two staff exposures
small-scale public/PR interaction
🚨
Major Breach
$8.7M/yr
Significant structural/environmental damage, multiple personnel impacted, major remediation, large-scale PR/legal response and potential one-off transport/containment escalation.
extended violent instability
mass exposures or casualties
public exposure requiring large PR and containment escalation
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 21 | [#3] 24/7 perimeter security staffing (18–24 personnel); midpoint used. |
| Research Scientist | 8 | [#5] Senior research staff studying reality/documentation effects (6–8 senior researchers). |
| Research Technician | 6 | [#5] Technical support staff for instrumentation and experiments (6 technicians). |
Confidence Notes
Analyst notes provide detailed ranges for most items, enabling mid-point budgeting, but the object's reality-altering/documentation-corrupting properties and uncertain incident frequency introduce material uncertainty in required redundancy and contingency sizing.