SCP-2501
Safe
~
medium confidence
SCP-2501
Expected annual
$1.7M
One-time setup
$2.4M
Annual recurring
$1.7M
Personnel
12
Total one-time capital and setup costs are approximately $2.36M, driven by vault hardening, remote-handling hardware, dedicated research program capital, and contingency/decommissioning reserves. Annual recurring costs are approximately $1.72M/year, driven mainly by staff wages, insurance/reserve allocations, emergency readiness, and ongoing research/monitoring.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal year with no containment incidents; regular operations, staffing, monitoring, and scheduled research expenditures only.
uneventful operations
scheduled research only
🚨
Minor Incident
$1.9M/yr
Localized incident or human-error activation requiring emergency response, forensic investigation, repairs, and limited PR/containment actions.
human error / accidental access
small containment breach or damage
🚨
Major Breach
$3.2M/yr
Significant containment breach or exposure requiring large-scale emergency operations, major facility upgrades or relocation, legal/cover operations and possible decommissioning efforts.
deliberate misuse or coordinated attack
catastrophic procedural failure / public exposure
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Lead | 1 | Project lead for anomalous materials and containment research. [#9] |
| Research Scientist | 1 | Additional senior research scientist allocation. [#9] |
| Engineer / Maintenance | 2 | Mechanical/electrical engineers for diagnostics, remote tooling and robotic integration. [#9] |
| Conservator / Machinist / Technician | 2 | Technicians for machine shop work, tooling, and conservation tasks. [#9, #10] |
| Security Officer / MTF Agent | 4 | Incremental dedicated Level-2 guards for vault security and rapid response (incremental staffing accounted in staff wages). [#14] |
| Security Liaison | 1 | Liaison between research team and security for access approvals and shifts. [#9] |
| Administrative Staff | 1 | Access/clearance administration and paperwork (background checks, keycard management). [#13] |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing mid-range estimates, but many items have wide ranges (e.g., research program and contingency reserves) and event-driven costs are highly uncertain, so confidence is medium.