SCP-2502
Euclid
~
medium confidence
SCP-2502
Expected annual
$157K
One-time setup
$234K
Annual recurring
$152K
Personnel
4
One-time containment setup and specialized tooling are estimated at roughly $228k up-front, with annual operating costs about $152k. Major cost drivers are staff allocations/site overhead, research/monitoring and calibration, and contingency/reserve funding for incident response.
One-Time Capital Costs
Total: $234K
Annual Recurring Costs
Total: $152K/yr
Cost Scenarios
📊
Baseline
(baseline)
$152K/yr
Normal, uneventful year with only routine inspections, maintenance, calibration, and modest research activity.
monthly inspections
routine calibration
no accidental contact or transport
🚨
Minor Incident
$162K/yr
Minor accidental contact or component degradation requiring emergency replacement and overtime.
pad/container degradation detected
minor accidental contact during handling
🚨
Major Breach
$252K/yr
Significant accidental cleavage or breach event requiring emergency response, repairs, amnestics, and substantial replacement/repair costs.
object falls/strikes hard surface
unexpected large-scale cleavage
containment assembly failure
🚨
Research Scale Up
$192K/yr
Active experimental campaign or increased research throughput requiring extra consumables, equipment rental, and additional staff time.
approval for extended testing
experimental expansion requiring additional capture and tooling
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | Approx. 0.1 FTE allocation to review anomalies, authorize procedures and oversee limited experiments [#16]. |
| Technician | 1 | Performs monthly inspections, preventive maintenance, and equipment calibration support (~0.05 FTE dedicated) [#9, #16]. |
| Security Officer / MTF Agent | 1 | On-call/security escort and periodic site presence (shared 0.05 FTE allocation) [#16, #13]. |
| Administrative Staff | 1 | Procurement, logging, and coordination for training/SOPs and cover-story tasks (fractional support) [#9, #17, #20]. |
Confidence Notes
Costs are based on explicit line-item ranges in the analyst notes and a conservative midpoint approach; uncertainties remain in frequency of transports/incidents, choice between off-the-shelf vs custom sealed manipulators, and site accounting conventions, so confidence is medium.