SCP-2605
Euclid
~
medium confidence
SCP-2605
Expected annual
$1.2M
One-time setup
$340K
Annual recurring
$1.2M
Personnel
13
One-time capital expenditures are modest (~$340k) for a humane Euclid containment cell, sensors, and initial research gear; recurring annual costs are dominated by security, nursing, and research personnel, plus administrative and contingency reserves (~$1.23M/yr). Main cost drivers are staff wages and active research/oversight.
One-Time Capital Costs
Total: $340K
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with routine operations, no major incidents; all recurring programs continue at budgeted levels.
routine care
scheduled research
no incidents
🚨
Minor Incident
$1.3M/yr
Single medical emergency or small containment-related repair requiring emergency treatment, short-term hospitalization, or expedited repairs.
medical emergency
equipment failure
short-term hospitalization
🚨
Major Breach
$1.7M/yr
Significant accidental exposure, staff injury, or legal claim requiring large settlements, facility repairs, and increased security measures.
public exposure
serious injury/legal claim
major facility damage
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] Two guards per shift, three shifts (round-the-clock coverage) as specified in analyst notes. |
| Caregiver / Nurse | 3 | [#6] One trained caregiver/nurse per shift (three positions) to assist with feeding, mobility, medication, and monitoring. |
| Medical Officer | 1 | [#7] Part-time attending physician (0.25–0.5 FTE) for medication management and periodic exams; counted as one medical officer on staff. |
| Research Scientist | 1 | [#15] Principal investigator (0.5–1 FTE) responsible for study design and oversight. |
| Research Technician | 2 | [#15] Technical staff (1–2) for data collection and analysis; two technicians assumed for continuous monitoring and experiments. |
Confidence Notes
Analyst notes provide detailed line items and salary assumptions making the budget reasonably grounded, but ranges for research intensity, legal contingencies, and decommissioning create moderate uncertainty.