SCP-262
Euclid
✓
high confidence
SCP-262
Expected annual
$2.7M
One-time setup
$6.2M
Annual recurring
$2.6M
Personnel
14
Initial capital costs are dominated by a suggested catastrophic breach reserve and containment/engineering one-time builds (~$6.16M total one-time). Recurring annual costs are driven by security and research staffing, emergency contracts, and contingency replenishment (~$2.616M/yr baseline).
One-Time Capital Costs
Total: $6.2M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Standard year with no major incidents; normal operations, scheduled research, routine maintenance and contingency replenishment.
routine_operations
scheduled_research
no_breach_or_major_incident
🚨
Minor Incident
$2.7M/yr
Localized incident (medical injury, small internal breach, equipment damage) requiring medical treatment, overtime, limited repairs and investigation.
operator_injury
limited containment breach
equipment_failure
🚨
Major Breach
$4.1M/yr
Significant containment breach requiring MTF response, temporary relocation, equipment replacement, extended investigations and enhanced cover operations.
containment_breach
public-exposure_risk
MTF_deployment
🚨
Catastrophic Breach
$8.6M/yr
Wide-scale failure, public exposure or loss of multiple assets requiring full remediation, large-scale cover-up operations, and possible reserve drawdown.
large_scale_breach
public_exposure
multi-asset_loss
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Two Level-2 guards per shift (3 shifts) for 24/7 coverage. |
| Security Supervisor | 1 | [#3] Level-3 supervisor/shift lead oversight. |
| Research Scientist (PI) | 1 | [#6] Principal investigator (~$140k). |
| Research Technician / Postdoc | 1 | [#6] Postdoc/lead technician (~$80k). |
| Lab Technician | 2 | [#6] 1–2 technicians (~$50k each) for experiments and handling. |
| Conservator | 1 | [#6, #16] Textile conservator (~$80k) responsible for inspections and stabilization. |
| Monitoring Technician | 1 | [#4] Surveillance/monitoring staff for camera/logging systems. |
| Administrative Staff | 1 | [#14, #19, #20] Admin/OPSEC coordination, cover-story management, auditing liaison. |
Confidence Notes
Line-item estimates are drawn directly from detailed analyst notes with explicit dollar figures and ranges; where ranges exist, reasonable midpoints were chosen and large contingency items are explicitly included, so aggregate totals are well-grounded though site-specific variation may apply.