SCP-264
Safe
~
medium confidence
SCP-264
Expected annual
$4.5M
One-time setup
$6.5M
Annual recurring
$4.4M
Personnel
13
Initial capital outlay is approximately $6.5M driven by mountain-site construction, structural stabilization, and equipment/spare caches. Ongoing annual costs are ~ $4.4M, dominated by staff wages, contingency/reserve funding, flight/transport logistics, and sustained research/monitoring.
One-Time Capital Costs
Total: $6.5M
Annual Recurring Costs
Total: $4.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.4M/yr
Normal operational year with no major incidents; routine inspections, research and reserve funding are maintained.
routine_monthly_inspections
scheduled_research
normal_staff_rotation
🚨
Minor Incident
$4.7M/yr
Localized damage, talisman degradation or weather-related infrastructure damage requiring mobilization, specialist repair and limited medevac.
localized_talisman_failure
severe_storm_or_avalanche
minor_goi_agitation
🚨
Major Breach
$6.9M/yr
Significant containment failure or large-scale public exposure requiring multi-day recontainment operations, heavy airlift, extended specialist teams and major repairs.
containment_breach
mass_exposure/pilgrim_incident
infrastructure_loss
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#10] Senior site manager responsible for overall operations and liaison. |
| Research Scientist / Lead Researcher | 1 | [#10, #15] Leads conservation science, sampling oversight and research programs. |
| Conservator | 2 | [#2, #10] Artifact/stupa conservators for talisman and structure preservation; rotating specialists as needed. |
| Security Officer / MTF Agent | 6 | [#10, #11] Rotating security staff maintaining perimeter, visitor escorting and responding to incidents. |
| Technician / Maintenance | 1 | [#5, #22] Site technician for power systems, generators, comms and spare-parts maintenance. |
| Medical Officer / Paramedic | 1 | [#14] On-site medic/paramedic trained for mountain rescue and emergency stabilization. |
| Administrative Staff | 1 | [#12, #13] Clerk/administrator for visitor processing, vetting coordination and documentation. |
Confidence Notes
Analyst notes provide detailed line items and ranges allowing a reasoned estimate, but many large ranges (helicopter ownership vs charter, contingency sizing, research intensity) create uncertainty. Estimates are mid-range choices; alternative operational decisions could move totals materially.