SCP-270
Euclid
~
medium confidence
SCP-270
Expected annual
$3.5M
One-time setup
$107.1M
Annual recurring
$3.5M
Personnel
17
One-time setup and contingency budgets dominate costs (notably structural concealment and a large contingency for catastrophic excavation), while annual personnel, research, and security operations drive recurring expenses.
One-Time Capital Costs
Total: $107.1M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal operational year with no major incidents; recurring operations proceed as budgeted.
steady_operations
routine_research
no_breach
🚨
Minor Incident
$3.6M/yr
Small security incident or equipment failure requiring activation of response teams, temporary relocation of some data, and equipment repair/replacement.
unauthorized_approach
equipment_failure
temporary_audio_leak
🚨
Major Breach
$5.5M/yr
Significant security breach with exposure of onsite materials, required evacuation, data purge/destruction actions, and partial rebuild/forensic response.
forced_entry
classified_data_exposure
psychogenic_cascade
🚨
Catastrophic Excavation
$103.5M/yr
Policy-ordered attempt to excavate/remove the indefinite cord or full neutralization requiring large-scale excavation/destruction efforts.
policy_order_to_destroy
cord_excavation_mandate
full_system_neutralization
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#8] On-site armed guards/security specialists (24/7 staffing with overlap). |
| Site Director / Executive Staff | 1 | [#10] On-site director / supervisory role included in research staffing. |
| Research Scientist / Cryptanalyst | 2 | [#10] Cryptanalysts for decryption and analysis. |
| Linguist / Analyst | 2 | [#10] Linguists for rare-language and cipher analysis. |
| Audio Engineer | 1 | [#10] Audio engineer for recording integrity and processing. |
| Archival Staff | 2 | [#11] Off-site archival & duplication staffing at Site-11 (secure transfer and storage staffing). |
| Custodian / Maintenance | 1 | [#18] Site maintenance & custodial staff for upkeep and cover-story maintenance. |
Confidence Notes
Analyst notes provide detailed line items and ranges allowing mid-point estimates, but several items (notably catastrophic excavation and contingency needs) are highly uncertain or potentially unbounded, leading to medium confidence.