SCP-2765
Safe
~
medium confidence
SCP-2765
Expected annual
$8.9M
One-time setup
$33.3M
Annual recurring
$8.7M
Personnel
59
One-time acquisition, construction and restoration across five sites dominate costs (~$33.3M one-time), with ongoing staffing, security, research and covert/cover operations driving recurring costs (~$8.67M/yr). Geopolitical risk and contingency premiums materially increase both totals.
One-Time Capital Costs
Total: $33.3M
Annual Recurring Costs
Total: $8.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.7M/yr
Normal, uneventful operation year with routine maintenance, staffing, research and cover operations only.
routine operations
no incidents
no new acquisitions
🚨
Minor Incident
$9.2M/yr
Localized incident (artifact contamination, small theft/vandalism, pest resurgence) requiring emergency response and limited conservation.
localized artifact incident
rodent/pest resurgence
minor theft or vandalism
🚨
New Instance Acquisition
$13.7M/yr
Discovery of an additional SCP-2765-1 instance requiring acquisition, initial security buildout and mobilization.
discovery of additional SCP-2765-1
urgent acquisition and setup
🚨
Major Covert Operation
$12.7M/yr
Forced/kinetic acquisition or large clandestine operation in a contested/GRU/ORIA area requiring extensive covert spending and crisis management.
kinetic forced acquisition
large clandestine covert operations
Personnel
59 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Local Guard | 40 | Approx. 8 guards per site (6–12 range); local hires for perimeter and routine security. Salaries averaged to match staff_wages. |
| Site Director / Executive Staff | 10 | Approx. 2 senior staff per site responsible for operations, cover-story management and liaison; higher local salary band. |
| Research Scientist | 6 | Multilingual specialists, epigraphers and analysts (3–8 specialists retained centrally/per-site); salaries included in staff_wages. |
| Administrative Staff | 3 | Central cataloging, accounting and administrative personnel (including Reliquary Site 26 support). |
Confidence Notes
Estimates compiled from wide per-item ranges and substantial geopolitical uncertainty; line-item ranges are well-described but jurisdictional risk, covert operation costs and incident frequency remain uncertain, yielding medium overall confidence.