SCP-2872
Euclid
~
medium confidence
SCP-2872
Expected annual
$4.7M
One-time setup
$84.2M
Annual recurring
$4.4M
Personnel
26
One-time upfront costs dominated by large contingency/reserve funds and R&D (~$84.2M); recurring annual operations (staff, trainers, security, legal, transport, research) are approximately $4.38M/yr, driven primarily by legal/cover operations, black-ops readiness, and trainer/jockey retainers.
One-Time Capital Costs
Total: $84.2M
Annual Recurring Costs
Total: $4.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.4M/yr
Normal year with no major incidents: routine operations, racing campaigns as scheduled.
scheduled Derby campaign
routine maintenance and testing
🚨
Minor Incident
$4.6M/yr
Small accident, transport mishap, localized property damage or targeted cover-story deployment requiring emergency response and PR/legal action.
transport incident
localized fence/wall damage
rapid PR/settlement deployment
🚨
Major Breach
$34.4M/yr
Containment failure or manifestation causing major local infrastructure damage (tens of millions), large cleanup and litigation.
manifestation escape
failure of stop-signal delivery
major roadway/utility destruction
🚨
Catastrophic Breach
$304.4M/yr
Large-scale, multi-jurisdictional destruction or prolonged uncontrolled manifestation requiring massive reconstruction, settlement and international operations.
uncontrolled long-distance manifestation
failure of all mitigation systems
large-scale infrastructure destruction
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#9] 24/7 guarded staffing and on-site security presence (background-screened covert guards). |
| Research Scientist | 3 | [#10, #17] Acousticians, signal-processing engineers and physiological researchers assigned to R&D/monitoring. |
| Medical Officer | 1 | [#5] Foundation medical veterinarian for semiannual exams and medical oversight. |
| Stable Staff (grooms/exercise riders/handlers) | 5 | [#8] Day-to-day animal care: grooms, exercise riders, handlers and stable manager (foundation-employed under front company). |
| Trainer / Jockey | 2 | [#4] Elite trainer and jockey retainers on contract/retainer to keep the stallion race-ready. |
| Black-Ops / Rapid Intervention Team | 4 | [#16] Covert intervention/clean-up team for rapid response to incidents. |
| Administrative Staff | 3 | [#15, #22] Legal, accounting and cover-story administration staff managing front companies and off-books channels. |
| Site Director / Executive Staff | 1 | Overall program/site management and liaison with Foundation administration. |
| Engineer / Maintenance | 1 | [#2] Facilities maintenance and equipment upkeep (power backups, stall systems, telemetry hardware upkeep). |
| Telemetry / Monitoring Operator | 1 | [#12] Live telemetry and sensor monitoring operator for GPS/accelerometer/biometric feeds. |
Confidence Notes
Line-item recurring and one-time operational costs are based on analyst-provided ranges and are reasonably grounded (medium confidence). Large-event probabilities and reserve sizing are highly uncertain due to anomalous behavior and tail risks, reducing overall confidence.