SCP-2954
Euclid
~
medium confidence
SCP-2954
Expected annual
$6.1M
One-time setup
$8.6M
Annual recurring
$6.0M
Personnel
54
Initial capital expenses are substantial (~$8.6M) driven by site acquisition, hardened bunker construction, and sensor/communications equipment; ongoing annual costs are ~ $6.0M dominated by staff wages (security, rapid response, researchers) and recurring operational contracts (medevac, data storage, legal/cover).
One-Time Capital Costs
Total: $8.6M
Annual Recurring Costs
Total: $6.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.0M/yr
Normal uneventful year with weekly Tsuburaya Events observed remotely and routine operations.
scheduled weekly events
no equipment loss
no civilian exposure
🚨
Minor Incident
$6.5M/yr
Small containment incident or localized equipment loss requiring emergency response, limited repairs, extra amnestic administrations, and small public compensation.
single-sensor loss or damaged drone
one-time medical evacuations
10s of amnestic administrations / small local exposure
🚨
Major Breach
$8.5M/yr
Significant breach or high-profile exposure requiring large equipment replacement, extensive repairs, major legal/cover payments, and large-scale containment response.
multiple asset destruction during an event
civilian casualties or public witnesses
need for large-scale emergency containment
Personnel
54 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#4] Perimeter guards and gate staff for 24/7 coverage; count chosen within the 24–36 range. |
| Rapid Response / Tactical Team | 8 | [#5] On-call specialists for breaches and emergency interventions; chosen within 6–12 range. |
| Research Scientist | 6 | [#6] Field researchers, seismologists, and A/V specialists for event analysis; within 4–8 range. |
| Engineer / Maintenance | 4 | [#7] Sensor techs, electricians, and IT maintenance staff; within 3–6 range. |
| Data Analyst / Archivist | 2 | [#19] Post-event data processing and reporting; within 1–3 range. |
| Cultural / Linguistic Staff | 2 | [#20] Japanese-language specialists and translators; within 1–3 range. |
| Medical Officer | 2 | [#13] On-site medics/ambulance staffing; medevac contract is separate. |
Confidence Notes
Notes provide detailed, plausible line items and ranges, allowing a bounded estimate; uncertainty remains due to anomalous-specific replacement costs, local political variability in land/permit costs, and frequency/severity of incident-driven asset losses.