SCP-2955
Euclid
~
medium confidence
SCP-2955
Expected annual
$23.3M
One-time setup
$82.1M
Annual recurring
$20.9M
Personnel
130
One-time construction and large contingency reserves dominate upfront costs (~$82.1M). Annual baseline operating costs (~$20.86M/year) are driven by on-site staffing, cover/black-ops budgets, monitoring, and capital replacement; per-transmigration events can add ~$10–40M each.
One-Time Capital Costs
Total: $82.1M
Annual Recurring Costs
Total: $20.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$20.9M/yr
Normal uneventful year with no transmigration events; annual recurring operational costs only.
no_transmigration
steady_operations
routine_monitoring
🚨
Transmigration Event
$37.4M/yr
A transmigration event requiring recovery: rebuild Area-846 at new location with associated land/covert costs and logistics.
transmigration_detected
rebuild_site
international_logistics
🚨
Major International Incident
$59.9M/yr
Transmigration into a hostile or highly-developed jurisdiction causing much higher per-event costs and diplomatic escalation.
transmigration_in_hostile_state
high-cost_land_acquisition
diplomatic_scale-up
Personnel
130 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#4] MTF Zeta-9 operational field team on-site full-time (24 operators). |
| Research Scientist | 12 | [#5] Remote analysts, geophysicists, archaeologists, monitoring technicians (remote/rotational). |
| Support Staff | 12 | [#6] Maintenance, cooks, med techs, drivers, admin required to run Area-846. |
| Local Contract Guards | 60 | [#7] Local hires acting as 'Argentine military' for cover story; contractor status reflected in wages. |
| Cover Story Agents / Embedded Staff | 20 | [#22] Embedded agents maintaining cover-story and liaising with local governments/media. |
| Medical Officer | 2 | [#25] Onsite medical personnel; medevac and contracts included in recurring medical budget. |
Confidence Notes
Estimates follow detailed analyst notes; staffing, equipment, and recurring baselines are well-specified, but per-event costs (land access, rebuilds, host-nation variability) and transmigration frequency are highly uncertain, so medium confidence.