SCP-3588
Unknown
✓
high confidence
SCP-3588
Expected annual
$2.4M
One-time setup
$793K
Annual recurring
$2.4M
Personnel
10
One-time startup costs are approximately $793,000 driven by property acquisition, stabilization and tactical equipment; recurring costs are about $2.37M/yr dominated by contracted security retainers and on-site guard wages.
One-Time Capital Costs
Total: $793K
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal operations with no major incidents; standard recurring costs only.
no_incident
🚨
Minor Incident
$2.5M/yr
Localized vandalism/trespass requiring emergency response, repairs, limited amnestic operations and overtime.
vandalism
unauthorized_entry
localized_damage
🚨
Major Breach
$3.9M/yr
Civilian injury/public exposure leading to litigation, large settlements, major remediation and reputational costs.
civilian_injury
public_media_exposure
legal_action
🚨
Research Breakthrough Requiring Scale Up
$2.9M/yr
Research findings require controlled access protocols, facility retrofits, and an expanded research team in-year.
unexpected_research_opportunity
need_for_scaleup
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Six FTEs rostered to provide continuous 24/7 on-site guard coverage (two 12-hour posts with leave/overlap). |
| Research Scientist | 2 | [#13] Senior research staff (1-2 senior researchers included in research staffing estimate). |
| Lab Technician | 1 | [#13] Technician supporting controlled interactions, equipment and data collection. |
| Security Liaison (research) | 1 | [#13] Research/security liaison embedded with the team for experiment coordination and safety. |
| Contracted Medical Personnel (on-call) | 0 | [#11] EMT/paramedic services are contracted (annual cost included) and do not represent a continuous on-site FTE. |
Confidence Notes
Analyst notes provide detailed line-item estimates and explicit recurring/one-time splits for most cost drivers (security retainers, guard FTEs, research staffing), enabling relatively high confidence. Residual uncertainty remains for legal/settlement tail risks and opportunity-cost assumptions.