SCP-3779
Safe
✓
high confidence
SCP-3779
Expected annual
$1.0M
One-time setup
$781K
Annual recurring
$1.0M
Personnel
10
Estimated one-time capital requirements are $781,000, driven by greenhouse retrofit, research outfitting, instruments, vehicle and initial contingency/legal costs. Recurring annual costs are approximately $1,019,500/yr, driven primarily by personnel wages, research operations and administrative overhead.
One-Time Capital Costs
Total: $781K
Annual Recurring Costs
Total: $1.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.0M/yr
Normal operational year with no major incidents; routine research, maintenance, and staffing expenses only.
no unauthorized-object incidents
no structural damage
standard experiments only
🚨
Minor Incident
$1.1M/yr
An unauthorized object is left in the greenhouse requiring urgent extraction, extra testing, and limited remediation.
unauthorized object discovered
external hazardous-material testing required
limited structural/cleanup repairs
🚨
Major Breach
$1.3M/yr
Forcible extraction or other event causes substantial greenhouse damage and hazardous contamination requiring major repairs/remediation and possible temporary shutdown.
forceful extraction causing structural damage
major biohazard/contamination requiring contractors
temporary site remediation and replacement equipment
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#8] Four guards to provide continuous coverage (shift coverage). |
| Horticulturist / Botanist | 2 | [#9] Two full-time horticulturists for watering and species care. |
| Research Scientist | 1 | [#9, #11] One research scientist to design/oversee experiments and analyses. |
| Lab Technician | 1 | [#9] One lab technician to support sample prep and basic instrumentation. |
| Site Manager / Executive Staff | 1 | [#10] One site manager/administrator overseeing operations. |
| Engineer / Maintenance | 1 | [#10] One maintenance/technician for repairs, irrigation and generator servicing. |
Confidence Notes
Estimates are based on detailed line-item analyst notes with mid-range figures for each category; main uncertainties are procurement choices, policy (24/7 guards vs. on-call), and whether the site is leased or purchased.