SCP-3917
Euclid
~
medium confidence
SCP-3917
Expected annual
$1.4M
One-time setup
$3.2M
Annual recurring
$1.4M
Personnel
12
Initial capital expenditures are dominated by land control and bespoke, non-silicon construction/engineering; mid-range first-year capital plus setup costs are several million USD. Ongoing annual costs are driven by staff wages, R&D/monitoring, insurance/cover operations, and specialized maintenance (~$1.36M/yr).
One-Time Capital Costs
Total: $3.2M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with steady operations, routine maintenance, and no containment incidents.
normal_operations
scheduled_maintenance
routine_research
🚨
Minor Incident
$1.4M/yr
Localized equipment failure or brief inadvertent pressure excursion requiring emergency depressurization and repairs, limited cleanup.
pump_or_valve_failure
small_unplanned_activation
emergency_depressurization
🚨
Major Breach
$6.4M/yr
Significant activation/breach event (e.g., SCP-3917-2 reanimation/escape or a wide-area activation) causing widespread equipment damage and emergency containment operations.
full_activation_above_1_atm
containment_breach
secondary_equipment_destruction
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#13] Four full-time security officers for perimeter and routine enforcement. |
| Security Supervisor | 1 | [#13] On-site security supervisor to manage patrols and liaison with command. |
| On-call rapid-response team/MTF | 4 | [#13] On-call rapid-response personnel budgeted as part of recurring security costs (rostered agents available for incidents). |
| Research Scientist | 1 | [#14] Senior containment/research lead responsible for experiments and R&D. |
| Technician | 2 | [#14] Two technicians for maintenance, sanitizer top-ups, resealing, and documentation. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a defensible mid-range estimate; however wide ranges on land costs, custom non-silicon construction premiums, and the low-frequency/high-impact breach risk reduce precision.