SCP-3950
Unknown
~
medium confidence
SCP-3950
Expected annual
$3.2M
One-time setup
$4.3M
Annual recurring
$3.2M
Personnel
21
Estimated one-time capital costs are roughly $4.34M for structural upgrades, custom imaging development, and contingency disposal; recurring annual costs are roughly $3.17M driven by security and research staffing, HVAC/energy, and multi-year research campaigns.
One-Time Capital Costs
Total: $4.3M
Annual Recurring Costs
Total: $3.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.2M/yr
Normal year with routine monitoring, no major incidents; recurring operational costs only.
routine_monitoring
scheduled_imaging_campaigns
no_incidents
🚨
Minor Incident
$3.3M/yr
Localized containment event (minor structural settlement, small repair, limited response and overtime).
localized_settlement
minor_seal_failure
small_medical_response
🚨
Major Breach
$3.7M/yr
Significant containment breach requiring major repairs, extended response, additional temporary security and testing.
partial_structural_failure
security_incident
extensive_repair
🚨
Catastrophic Disposal
$5.2M/yr
Decision and execution of full decommissioning/disposal of the lithopedion (demolition, specialized incineration/remediation).
mandated_disposal
regulatory_intervention
irrecoverable_breach
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#6] 24/7 guard coverage including supervisors (rotating shifts). |
| Research Scientist / PI | 1 | [#9, #21] Lead researcher managing studies and oversight. |
| Research Scientist | 1 | [#9, #21] Additional research scientist supporting experiments and analysis. |
| Pathologist / Medical Officer | 2 | [#9] Full-time pathologists/forensic physicians for sampling and interpretation. |
| Researcher / Lab Technician | 4 | [#9, #11, #12] Lab technicians handling assays, sampling, and equipment operation. |
| Radiologist Consultant | 1 | [#9, #10] Part-time radiology consultant for imaging campaigns (on-call/contract basis). |
Confidence Notes
Analyst notes provide detailed line-item estimates for most categories, enabling midrange budgeting; uncertainty remains around advanced imaging development cost, disposal scale, and long-term research scope, so confidence is medium.