SCP-3951 Keter ? low confidence
SCP-3951
Expected annual
$19.8M
One-time setup
$580.7M
Annual recurring
$15.6M
Personnel
50
One-time setup and contingency/reserve requirements dominate costs (initial capital and large emergency reserves pushing totals into the hundreds of millions), while ongoing costs are driven by specialist staffing, remote operations (UAVs, sensors, fuel, comms) and indigenous liaison obligations (~mid-single-digit millions/year).
🏗️ One-Time Capital Costs Total: $580.7M
Emergency Reserve Fund $300.0M
[#19] Large one-time contingency/reserve recommended for evacuation, regional disaster response, infrastructure repair and uninsured catastrophic losses.
Contingency One Time $116.1M
[#30] One-time contingency buffer applied to capital/one-time items (approx. 25% of one-time subtotal before contingency per analyst recommendation).
Ice Stabilization Mitigation $100.0M
[#20] Contingent capital for cryogenic anchors, refrigeration, grout injection, engineered buttressing and other geotechnical measures if active stabilization is required.
Decommissioning Planning $27.5M
[#28] Planning and initial contracting for potential demolition/neutralization contingencies (modeling, engineering contracts).
Equipment $17.1M
[#5, #7, #9, #11, #15, #21, #25] Remote command center build/IT hardware, initial UAV fleet purchase, underwater/ROV and sensor purchase, seismic deployment hardware, satcom hardware, initial archival hardware, and transportation capital purchases.
Facilities $16.8M
[#3, #13] Arctic-hardened field camp construction and on-site power-generation infrastructure capital (runways/helipad, shelters, gensets, fuel tanks, cold-start hardware).
Site Acquisition And Permits $1.5M
[#1] Land-use agreements, sovereign permits, environmental permits, title/survey work and legal structuring for classified Arctic operations.
Cover Story Initial $1.0M
[#22] Initial PR/cover-story setup, legal counsel for secrecy agreements and initial denial resources.
Initial Research And Lab Setup $625K
[#16] Field BSL-2/3-capable lab setup, cold-chain and sampling infrastructure for SCP-3951-2 material analysis.
Specialized Training Initial $100K
[#23] Initial "do not converse" briefings, interpreter hiring for Inuktitut, and development of approved communication templates.
🔄 Annual Recurring Costs Total: $15.6M/yr
Staff Wages $5.3M/yr
[#4, #6, #18, #12, #26, #8, #25] Wages/hazard premiums for remote monitoring personnel, rotating field caretakers/technicians, rapid-response team, on-call geophysicists, research staff, UAV pilots and essential logistics drivers (payroll portion extracted from several line items).
Contingency Recurring $3.1M/yr
[#30] Ongoing contingency buffer (~25% of recurring subtotal before contingency) for weather delays, supply-chain premiums and inflation.
Field Camp Operations Nonwage $1.0M/yr
[#4] Non-wage camp operating costs: heating fuel (site use), re-supply logistics (non-payroll), janitorial, waste removal and consumables not classified as payroll.
Fuel Logistics And Energy Ops $800K/yr
[#14] Regular fuel resupply (air/ship/helicopter charters), fuel handling and spill mitigation (non-payroll transport).
Insurance And Overhead $800K/yr
[#29] Accounting overhead, internal actuarial provisioning and any insurable premiums where available.
Uav Operations And Maintenance $700K/yr
[#8] Consumables, batteries, spares, maintenance and insurance (pilot wages moved to staff_wages).
Indigenous Liaison And Compensation $600K/yr
[#2] Ongoing liaison, community compensation, employment quotas and mitigation programs to maintain consent and avoid leaks.
Satellite Imagery And Tasking $400K/yr
[#10] Tasking fees, SAR/optical imagery subscriptions and historical imagery licensing.
Legal And Diplomatic Retainer $400K/yr
[#24] Ongoing legal and diplomatic counsel (international law, indigenous rights, environmental counsel).
Transportation Ops Nonwage $400K/yr
[#25] Vehicle/snowmobile/aircraft charter operating costs (driver wages moved to staff_wages).
Containment Research Nonwage $400K/yr
[#26] Field experiments, behavioral studies and non-payroll research expenses (research staff wages moved to staff_wages).
Security Ops Nonwage $350K/yr
[#18] Non-payroll security readiness costs (training exercises, equipment maintenance) for the rapid-response ground team (payroll moved to staff_wages).
Wildlife Monitoring And Mitigation $250K/yr
[#17] Ongoing ecological monitoring, compensation programs and mitigation studies.
Cover Story Recurring $250K/yr
[#22] Ongoing PR/denial management and restricted-airspace/NOTAM maintenance.
Underwater Sensor Maintenance $150K/yr
[#9] Maintenance and consumables for ROVs, hydrophones and ice-penetrating gear.
Seismic Monitoring Nonwage $150K/yr
[#12] Telemetry, data storage, calibrations and alerting tool costs (on-call geophysicist wages moved to staff_wages).
Satcom Bandwidth $150K/yr
[#15] Ongoing satcom bandwidth and airtime (Starlink/Iridium/leased links).
Archival And Data Storage Recurring $150K/yr
[#21] Secure long-term archival and classified data storage subscriptions and offsite redundancy.
Lab Testing And Disposal $125K/yr
[#16] Recurring sample testing, PPE turnover and biohazard disposals.
Ppe And Cold Weather Replacements $50K/yr
[#27] Replacement of Arctic-rated suits, PPE and consumables.
Training Recurring $30K/yr
[#23] Annual refreshers for "do not converse" briefings and interpreter support.
Facilities Maintenance $0/yr
[]
Supplies And Consumables $0/yr
[]
Research And Monitoring $0/yr
[]
Logistics And Transport $0/yr
[]
Cover Story And Legal $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $15.6M/yr
90.0% probability / year
Normal year with continuous unmanned monitoring, scheduled maintenance, liaison and routine operations; no major incidents.
steady_operations routine_maintenance scheduled_re-supply
🚨 Minor Incident $17.6M/yr
8.0% probability / year +$2.0M vs baseline
Localized incidents such as drone losses, sensor array damage, severe storm causing temporary outages or small containment-related medical incidents requiring emergency response but not SCP movement.
drone_loss sensor_failure localized_storm_damage
🚨 Major Breach $215.6M/yr
2.0% probability / year +$200.0M vs baseline
SCP-3951 partially or wholly exits SCP-3951-1 or causes significant seismic/structural damage requiring large-scale evacuation, infrastructure repair and deployment of contingency stabilization or demolition resources.
significant_seismic_event structural_collapse SCP-3951_exit
👥 Personnel 50 total
Role Count Notes
Remote Monitoring Operator / Linguist / Drone Pilot 20 [#6] 24/7 watch shifts, Inuktitut linguists, drone pilots and analysts included in remote monitoring payroll.
Technician / Field Caretaker 12 [#4] On-site caretakers and rotating technical staff for camp operations, maintenance and resupply operations.
Security Officer / MTF Agent 6 [#18] Small rapid-response ground team trained for cold-weather search & rescue and emergency containment.
Research Scientist 6 [#12, #26] Behavioral scientists, geophysicists and field researchers supporting monitoring and containment research programs.
Engineer / Maintenance 4 [#8, #25] UAV/ROV technicians, power and vehicle engineers for maintenance and logistics.
Administrative Staff 2 [#22, #24] Program administrators, legal/liaison coordinators and PR support (payroll portion included in staff_wages where applicable).
📋 Confidence Notes
Substantial uncertainty due to the SCP's anomalous nature, jurisdictional variables, and very wide ranges in analyst estimates (particularly for contingency, stabilization and catastrophic response). Many costs are contingent on political approval and unpredictable events, so precision is low.
← SCP-3950 ↑ All SCPs SCP-3952 →