SCP-3990
Euclid
~
medium confidence
SCP-3990
Expected annual
$3.8M
One-time setup
$4.6M
Annual recurring
$3.7M
Personnel
17
Initial, one-time capital to build three automated ECM stations, a reinforced paddock and specialized equipment is roughly $4.6M; ongoing annual operations (staff, maintenance, legal/cover, reserves and research) are roughly $3.73M, driven mainly by staffing, emergency reserves, and research/capture costs.
One-Time Capital Costs
Total: $4.6M
Annual Recurring Costs
Total: $3.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.7M/yr
Normal operational year with no major incidents; routine maintenance, staffing, research and reserves expensed as planned.
no ECM failures
no major escapes
routine maintenance and research only
🚨
Minor Incident
$3.9M/yr
Localized ECM station failure or small public-exposure event requiring repairs, legal payouts and extra field operations.
station hardware failure
small breach or public complaint
emergency repairs and settlements
🚨
Major Capture Campaign
$4.5M/yr
A large, resource-intensive capture campaign to secure remaining SCP-3990-2 specimen(s) or a prolonged capture effort following ECM failure.
prolonged capture operation
multiple high-cost field deployments
specialist contractors/helicopter use
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Central Monitoring Operator / Supervisor | 8 | 24/7 monitoring staff across shifts plus supervisory coverage (maps to #6). |
| Field Maintenance Technician | 3 | Technicians for station maintenance, pre-event checks and repairs (maps to #7). |
| Veterinarian / Veterinary Technician | 2 | On-site veterinary staffing for animal care, medical procedures and quarantine (maps to #13). |
| Research Scientist / Lab Technician | 3 | Research program personnel for behavioral, genetic and pathology work (maps to #25). |
| Administrative Staff / Site Coordinator | 1 | Administrative, scheduling and liaison duties (supports #6, #21). |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing informed mid-point estimates, but many costs (capture frequency, R&D scope, reserves) are uncertain, so overall confidence is medium.