SCP-4085
Safe
~
medium confidence
SCP-4085
Expected annual
$10.5M
One-time setup
$16.6M
Annual recurring
$9.8M
Personnel
77
Initial setup is roughly $16.6M driven by facilities, containment hardware, and research/lab setup; recurring annual costs are roughly $9.78M driven by staff wages, research/monitoring, and contingency/reserve requirements.
One-Time Capital Costs
Total: $16.6M
Annual Recurring Costs
Total: $9.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.8M/yr
Normal year with routine operations, no major incidents.
routine_operations
no_breach
standard_research_activity
🚨
Minor Incident
$10.3M/yr
Localized equipment losses, minor breach attempts, small-scale repairs and medical payouts.
equipment_damage
minor_breach
limited_personnel_injuries
🚨
Major Breach
$14.8M/yr
Significant containment breach or coordinated attack causing structure damage, multiple casualties and major repairs.
large_scale_breach
site_damage
multiple_casualties
🚨
Major Interior Excavation
$34.8M/yr
Decision/year in which major tunneling/excavation/remediation into the 8,000 m interior is undertaken.
decision_to_excavate
large_scale_geotechnical_work
experimental_mitigation_builds
Personnel
77 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 40 | [#4] Armed security for 24/7 coverage; includes rotations and benefits. |
| Specialized Rapid-Response Team | 6 | [#5] Anti-anomaly tactical intervention team; armored transport/operators included. |
| Research Scientist | 10 | [#6] Anomalous specialists and senior researchers assigned to SCP-4085 study and Abaddon Energy research. |
| Technical / Engineer / Maintenance | 10 | [#7] Electricians, HVAC, IT, fabricators and maintenance staff for containment systems. |
| Medical Officer | 4 | [#15] On-site trauma surgeons, medics and psychiatric emergency staff. |
| Administrative Staff | 6 | [#30] Documentation, HR, accounting, procurement and administrative support for Site-90. |
| Site Director / Executive Staff | 1 | [#30] Site leadership and executive decision-making (Director-level). |
Confidence Notes
Analyst notes are detailed with line-item ranges and drivers, allowing a reasoned estimate; uncertainty remains on frequency of breaches, scale of excavation decisions and Abaddon Energy effects which produce variance in multi-year totals.