SCP-4138
Keter
~
medium confidence
SCP-4138
Expected annual
$34.0M
One-time setup
$129.5M
Annual recurring
$30.8M
Personnel
50
One-time capital costs are dominated by a large contingency reserve and space/insider setup (~$129.5M). Recurring operations (staff, cyber operations, covert field actions, legal/PR, monitoring and logistics) drive annual costs of ~ $30.8M, with adverse events potentially increasing this by tens to hundreds of millions.
One-Time Capital Costs
Total: $129.5M
Annual Recurring Costs
Total: $30.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$30.8M/yr
Normal operational year with routine monitoring, occasional field actions, and no major public exposures.
routine_discoveries
standard_field_ops
no_major_media_attention
🚨
Minor Incident
$33.3M/yr
Localized discovery or a single widely-covered excavation requiring several emergency field actions and targeted PR/legal responses.
local_discovery
single_large_excavation
limited_media_attention
🚨
Major Breach
$55.8M/yr
Significant public exposure across jurisdictions requiring major emergency response, diplomatic engagement, and substantial contingency spending.
significant_public_exposure
multiple_sites_compromised
international_diplomatic_incident
🚨
Catastrophic Breach
$180.8M/yr
Widespread discovery or extraterrestrial-related exposure necessitating full mobilization of contingency reserve and emergency global actions.
widespread_discovery
extraterrestrial_exposure
loss_of_space_assets
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 12 | [#1] Paleobiologists and lab scientists performing analyses and producing cover analyses. |
| Security Officer / MTF Agent | 10 | [#1] Field security and rapid-response personnel for seizures, site security and witness control. |
| OSINT Analyst | 8 | [#1] Monitoring academic literature, social media, dark web and tip-lines for sightings and discoveries. |
| Field Case Officer | 6 | [#1] Coordinate seizures, local contractors, and onsite operations. |
| Legal / PR | 4 | [#1] Manage gag orders, buyouts, counter-publications and influence campaigns. |
| Operations / Logistics | 6 | [#1] Logistics, transport contracting, and equipment maintenance coordination. |
| Administrative Staff | 4 | [#1] Administrative support, finance, and compliance tracking for the program. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs, improving confidence, but wide ranges (esp. cyber operations, smallsat/insider costs, and contingency needs) and uncertainty about extraterrestrial interference keep overall confidence at medium.