SCP-4167
Keter
~
medium confidence
SCP-4167
Expected annual
$16.8M
One-time setup
$40.2M
Annual recurring
$15.8M
Personnel
27
Initial capital outlay is approximately $40,200,000 driven by ward construction, specialized containment/equipment and a contingency reserve; recurring operational costs are about $15,800,000/yr driven by staff wages, ongoing research/surveillance, utilities and consumables.
One-Time Capital Costs
Total: $40.2M
Annual Recurring Costs
Total: $15.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.8M/yr
Normal year with routine operations, scheduled research and no major containment incidents.
no_incidents
routine_operations
🚨
Minor Incident
$17.3M/yr
Localized containment breach or attempted egg-release requiring rapid response, limited hospitalizations and targeted remediation.
localized_breach
limited_exposure
emergency_response
🚨
Major Breach
$45.8M/yr
Significant containment failure or public exposure requiring mass-decontamination, large-scale medical response, legal/cover operations and extended remediation.
mass_breach
public_exposure
wildlife_spillover
Personnel
27 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | Armed/secure-transport and rapid-response personnel for 24/7 security and patient transfer; included in staff_wages estimates [#10]. |
| BSL-4 Nurse / Technician | 8 | Direct patient care and BSL-4 operations staffing for round-the-clock ward coverage; included in staff_wages [#9]. |
| Research Scientist | 4 | Parasitology/neurobiology research staff supporting monitoring, sequencing and R&D; included in staff_wages and research budgets [#9, #16]. |
| Lab Technician | 3 | Laboratory support for assays, sequencing prep, and sample handling; included in staff_wages [#9]. |
| Neurosurgeon / Medical Specialist (on-call) | 2 | Skilled surgical staff for retrieval operations and emergency intervention (on-call arrangements reflected in salary costs) [#11]. |
| Site Manager / Administrative Staff | 1 | Site-level management, records control and administrative support for quarantine operations; included in staff_wages [#9, #20]. |
Confidence Notes
Line-item hardware and routine operational costs are reasonably well-constrained; high uncertainty remains around R&D (vaccine development), wildlife eradication scale and the frequency/severity of breach events, so mid-level confidence is assigned and large deviations are plausible.