SCP-4168
Euclid
✓
high confidence
SCP-4168
Expected annual
$1.0M
One-time setup
$1.1M
Annual recurring
$1.0M
Personnel
11
Initial one-time containment and fit-out costs are approximately $1.14M, with recurring annual operations around $1.04M driven mostly by staff wages (security, medical, research) and ongoing legal/monitoring needs.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $1.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.0M/yr
Normal year with routine operations, no major incidents.
routine containment
scheduled testing
normal staff turnover
🚨
Minor Incident
$1.1M/yr
Minor noncompliance or medical complication requiring additional care and short-term response.
short-term separation/compliance failure
unexpected abscess/surgery
small-scale PR/legal takedown
🚨
Major Medical Emergency
$1.5M/yr
Significant medical emergency or violent incident causing major treatment, extended care, and legal/PR response.
severe separation injury requiring surgery
violent breach involving subjects
extended hospitalization and legal exposure
🚨
Decommission And Transfer
$1.2M/yr
Facility closure or reclassification requiring secure transfer, legal wind-down and cleanup in the year it occurs.
reclassification
site closure
forced transfer by external authority
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Lead Researcher | 1 | [#7] One full-time lead researcher (Euclid humanoid specialist) assigned to SCP-4168. |
| Research Assistant | 1 | [#7] 0.5 FTE research assistant (modeled as one assigned part-time staff for staffing headcount). |
| Medical Officer / RN | 1 | [#8] Full-time on-site medic/nurse trained in anesthesia monitoring and wound care. |
| Physician / Anesthesiologist (retainer) | 0 | [#9] On-call physician/anesthesiologist retained (not resident on-site; retainer cost accounted in wages). |
| Security Officer / MTF Agent | 6 | [#10] Continuous guard coverage with minimum 2 guards per shift (6 guards total to staff 24/7). |
| Administrative Staff / Legal Liaison | 1 | [#19] Administrative/legal support for cover story, takedowns and identity maintenance (contracted or small in-house team). |
| Archival / Transcription Staff | 1 | [#24] Staff or contracted transcription/archiving support for interview redaction and record maintenance. |
Confidence Notes
Analyst notes provide detailed line-item estimates and ranges for construction, equipment, staffing and recurring services; mapping from each numbered item to cost categories is direct and granular, so aggregate estimates are high-confidence.