SCP-4169
Euclid
~
medium confidence
SCP-4169
Expected annual
$4.8M
One-time setup
$12.2M
Annual recurring
$4.6M
Personnel
25
Estimated one-time setup costs are approximately $12.22M driven by facility construction, site-specific engineering (airlock, inerting, explosion-safe systems) and lab buildout; annual recurring operations are approximately $4.64M/yr driven by on-site staff wages, MTF assignment, and ongoing maintenance/consumables.
One-Time Capital Costs
Total: $12.2M
Annual Recurring Costs
Total: $4.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.6M/yr
Normal uneventful year with routine maintenance, staff rotations and no major incidents.
no equipment failures
no breaches
routine research and maintenance
🚨
Minor Incident
$4.9M/yr
Localized failure such as camera network damage, drone loss or small containment breach quickly contained.
camera(s) damaged
drone loss or repair requiring spares
small on-site containment/repair operation
🚨
Major Breach
$6.1M/yr
Significant containment breach requiring large-scale remediation, equipment replacement and environmental restoration.
multiple-instance escape
extensive equipment destruction
environmental remediation required
🚨
Political Exposure
$5.1M/yr
Local exposure or legal/PR crisis requiring large cover payments, legal settlements and increased operational secrecy.
civilian discovery
local government scrutiny
leak to media
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Site Security | 15 | [#15] Dedicated 24/7 security complement to provide continuous coverage and patrols (12–18 FTE range used). |
| Research Scientist | 6 | [#17] Taxonomists, paleobiologists and senior research staff (portion of the 8–12 research FTE complement). |
| Lab Technician | 3 | [#20, #21] Lab techs for BSL-3 operation, sample prep and routine sequencing support. |
| Drone Pilot / UAV Operator | 1 | [#10, #17] Operator(s) for repair drones and remote inspection systems (included in scientific/technical staffing estimate). |
Confidence Notes
Analyst notes provide detailed line items and ranges for nearly every major cost, enabling a reasoned estimate; uncertainties remain in site-specific build costs, incident probabilities and long-term remediation needs, so confidence is medium.