SCP-4235 Safe ~ medium confidence
SCP-4235
Expected annual
$79K
One-time setup
$231K
Annual recurring
$77K
Personnel
2
One-time capital (granite container, site pad, monitoring hardware and optional robotics) ~ $230,750; main recurring drivers are staff/security, research/monitoring, replacement/repairs, data storage and asset amortization, totaling ~$75,475/yr.
🏗️ One-Time Capital Costs Total: $231K
Facilities $108K
[#1, #2, #6] Granite-coated containment vessel fabrication/installation, outdoor concrete pad, fencing/secondary barrier and power/network hookup civil work. Estimate combines $80,000 for custom granite container, $25,000 for pad/fence, $3,000 for power/network site hookup civil work.
Equipment $68K
[#3, #4, #5, #6, #12] Automated remote watering system ($7,500), environmental/structural sensors ($12,000), CCTV & remote monitoring hardware ($7,500), UPS/hardware ($1,000), optional robotic/remote manipulation toolkit contingency ($40,000).
Contingency Reserve $30K
[#17] One-time contingency/reserve fund for emergency purchases and rapid replacement (~$10,000–$50,000; midpoint used).
Initial Research And Lab Setup $15K
[#13] Initial laboratory analysis and tests for histology/genetics/materials and initial monitoring program setup (~$15,000).
Transportation And Heavy Lift $8K
[#18] Initial planning / contingency budget for heavy-lift/transport per-move (~$2,000–$15,000; midpoint used).
Ppe Initial $1K
[#11] Initial PPE and exposure mitigation equipment purchase (~$500–$2,000; midpoint used).
🔄 Annual Recurring Costs Total: $77K/yr
Asset Amortization $23K/yr
[#22] Long-term degradation insurance / amortization (set to ~10% of one-time capital spend of $230,750).
Staff Wages $12K/yr
[#8, #9] Weekly inspection personnel time (~$2,500/yr) plus incremental security overhead (~$10,000/yr) for additional patrol/checkpoint scheduling and access administration.
Research And Monitoring $10K/yr
[#13] Ongoing laboratory analysis and monitoring program (~$5,000–$15,000/yr; midpoint used).
Replacement And Repairs $8K/yr
[#15] Replacement/repair budget for degraded objects (electronics, housings, sacrificial shielding) (~$2,000–$15,000/yr; midpoint used).
Cover Story And Legal $8K/yr
[#19] Record management, legal/cover story and administrative support (~$3,000–$12,000/yr; midpoint used).
Emergency Drills And Contingency $6K/yr
[#17] Annual emergency protocol development, training drills and small contingency operating spend (~$3,000–$10,000/yr; midpoint used).
Facilities Maintenance $3K/yr
[#7, #16] Ongoing utilities/IT power consumption and minor site maintenance (~$1,600/yr) plus amortized granite/container reseal & scheduled maintenance (~$1,150/yr).
Data Storage And Archival $2K/yr
[#7, #21] Video and sensor data storage, retention and archival (~$1,000–$4,000/yr; midpoint used; portion of #7 and #21).
Medical Surveillance $2K/yr
[#10] Personnel medical surveillance & occupational health (~$500/person/yr for 2–4 people; midpoint ~$1,500/yr).
Waste Handling $1K/yr
[#20] Waste handling and biohazard disposal for organic debris (~$500–$2,000/yr; midpoint used).
Supplies And Consumables $600/yr
[#14] Consumables for horticulture and containment (substrate, distilled water, small supplies) (~$200–$1,000/yr; midpoint used).
Ppe Replacement $200/yr
[#11] Annual PPE replacements and small equipment refresh (~$200/yr).
Water And Irrigation $100/yr
[#3] Water usage for automated watering system (~$100/yr as noted).
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $77K/yr
83.0% probability / year
Normal year with routine inspections, monitoring, and no major incidents.
routine_inspections normal_monitoring no_equipment_failures
🚨 Minor Incident $85K/yr
10.0% probability / year +$8K vs baseline
Minor equipment failure or localized deterioration requiring replacement and modest emergency response.
sensor_or_camera_failure localized structural seal damage
🚨 Replacement Move $89K/yr
5.0% probability / year +$12K vs baseline
Planned or emergency relocation / heavy-lift operation to move SCP-4235 or its container.
decision_to_relocate road_permits_and_crane_required
🚨 Major Breach $125K/yr
2.0% probability / year +$48K vs baseline
Significant container failure or accelerated degradation event requiring major emergency response, reseal/replacement and extended research.
container_structural_failure unexpected_acceleration_in_entropic_effects
👥 Personnel 2 total
Role Count Notes
Horticultural Technician 1 [#8] Responsible for weekly watering/inspection under the 30-minute exposure rule; incremental cost reflected in staff_wages.
Security Officer / MTF Agent 1 [#9] Incremental guard scheduling and one additional patrol checkpoint; cost reflected in staff_wages/security overhead.
📋 Confidence Notes
Analyst notes provide ranges and clear line items for all expected costs but many items are range-based and some optional (robotics, contingency reserve) making point estimates uncertain; confidence rated medium.
← SCP-4234 ↑ All SCPs SCP-4236 →