SCP-4235
Safe
~
medium confidence
SCP-4235
Expected annual
$79K
One-time setup
$231K
Annual recurring
$77K
Personnel
2
One-time capital (granite container, site pad, monitoring hardware and optional robotics) ~ $230,750; main recurring drivers are staff/security, research/monitoring, replacement/repairs, data storage and asset amortization, totaling ~$75,475/yr.
One-Time Capital Costs
Total: $231K
Annual Recurring Costs
Total: $77K/yr
Cost Scenarios
📊
Baseline
(baseline)
$77K/yr
Normal year with routine inspections, monitoring, and no major incidents.
routine_inspections
normal_monitoring
no_equipment_failures
🚨
Minor Incident
$85K/yr
Minor equipment failure or localized deterioration requiring replacement and modest emergency response.
sensor_or_camera_failure
localized structural seal damage
🚨
Replacement Move
$89K/yr
Planned or emergency relocation / heavy-lift operation to move SCP-4235 or its container.
decision_to_relocate
road_permits_and_crane_required
🚨
Major Breach
$125K/yr
Significant container failure or accelerated degradation event requiring major emergency response, reseal/replacement and extended research.
container_structural_failure
unexpected_acceleration_in_entropic_effects
Personnel
2 total
| Role | Count | Notes |
|---|---|---|
| Horticultural Technician | 1 | [#8] Responsible for weekly watering/inspection under the 30-minute exposure rule; incremental cost reflected in staff_wages. |
| Security Officer / MTF Agent | 1 | [#9] Incremental guard scheduling and one additional patrol checkpoint; cost reflected in staff_wages/security overhead. |
Confidence Notes
Analyst notes provide ranges and clear line items for all expected costs but many items are range-based and some optional (robotics, contingency reserve) making point estimates uncertain; confidence rated medium.