SCP-4267
Unknown
~
medium confidence
SCP-4267
Expected annual
$1.0M
One-time setup
$2.0M
Annual recurring
$1.0M
Personnel
11
One-time setup costs are roughly $2.03M driven by property acquisition, specialised robotics/winch systems, and an R&D contingency; annual recurring operations are about $1.01M/yr driven by staff wages (research + security), research/monitoring, and ongoing maintenance and legal/cover costs.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $1.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.0M/yr
Normal operational year with routine inspections, scheduled cleaning and no major incidents.
scheduled robotic inspections
periodic creosote cleaning
normal staff rotations
🚨
Minor Incident
$1.1M/yr
Localized equipment failure or small containment incident requiring emergency repairs and limited replacement gear.
robotic/tether failure
localized fire or contamination
small structural damage
🚨
Major Breach
$1.6M/yr
Significant containment failure or incident (injuries, escape of an entity, structural collapse) requiring large emergency response and equipment replacement.
entity escape or aggressive anomalous event
major structural collapse
large-scale equipment loss
🚨
Political Exposure
$1.3M/yr
Discovery or public exposure that requires significant cover-up, legal defense, amnestic-equivalent operations, and local relocation/compensation.
local disclosure
media/legal attention
regulated environmental enforcement
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Senior Researcher | 1 | [#3] Lead scientist responsible for project oversight, data analysis, and mission decisions (salary estimate included in staff_wages). |
| Research Technician | 3 | [#3] Technicians for robotic operation, sample handling, maintenance and daily monitoring (salaries included in staff_wages). |
| Security Officer / MTF Agent | 6 | [#4] 24/7 security coverage via three 8-hour shifts or equivalent roster (salaries included in staff_wages). |
| Site Manager / Administrative Staff | 1 | [#3, #20] On-site manager handling administration, cover-story coordination and liaison with local contractors (salary included in staff_wages and cover/legal costs). |
Confidence Notes
Analyst notes provide detailed line-item ranges and operational assumptions; however the anomaly's unknown/variable nature (possible long-range interior, historical incident) and wide cost ranges for bespoke R&D reduce precision.