SCP-4287
Euclid
~
medium confidence
SCP-4287
Expected annual
$211K
One-time setup
$243K
Annual recurring
$197K
Personnel
1
First-year (one-time) setup and contingency costs are roughly $239k driven by facility reinforcements, equipment (tracking and custom receptacles), research/testing and liability reserves; ongoing annual operations average about $197k/yr driven by handler wages, contingency reserve, ongoing research/monitoring, veterinary care, and janitorial/repairs.
One-Time Capital Costs
Total: $243K
Annual Recurring Costs
Total: $197K/yr
Cost Scenarios
📊
Baseline
(baseline)
$197K/yr
Typical, uneventful year with routine operations, handler duties, regular monitoring, and contingency reserve but no major incidents or large one-off engineering projects.
normal_daily_operations
routine_vet_and_maintenance
periodic_monitoring
🚨
Minor Incident
$212K/yr
Localized damage from SCP-4287-1 impacts (damaged equipment or furniture), one or two emergency vet cases, extra janitorial/repair needs, and modest PR/legal follow-up.
pellet_damage_to_noncritical_equipment
single emergency_vet_case
minor_public_observation requiring cover
🚨
Major Breach
$427K/yr
Significant pellet-caused failure of pressurized infrastructure or high-profile exposure leading to in-house chamber construction or large reinforcements, major liability/PR costs, and extensive testing/engineering response.
pellet_compromise_of_pressurized_system
staff_injury_or_high_liability_event
need_for_in-house_testing_chamber and major_reinforcement
Personnel
1 total
| Role | Count | Notes |
|---|---|---|
| Animal Handler / Avian Specialist | 1 | [#4] Dedicated 0.5–1.0 FTE handler accounted for in staff_wages (midpoint used). |
Confidence Notes
Many specific line items have defined ranges and operational precedents (food, handler wages, tracking); however uncertainty remains around pellet energetics, frequency/severity of impact incidents, and programmatic choices (contract testing vs. building a chamber, liability tolerance). This produces a medium confidence in the quantitative estimates.