SCP-4390
Unknown
?
low confidence
SCP-4390
Expected annual
$4.9M
One-time setup
$5.4M
Annual recurring
$4.8M
Personnel
32
Estimated one-time setup costs are approximately $5.42M driven primarily by contingency reserves, lab upgrades (BSL/sample processing), secure storage and long-term endowment; recurring annual costs are approximately $4.77M driven largely by staff wages, research/monitoring, GOI liaison and BSL operations.
One-Time Capital Costs
Total: $5.4M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal operational year with routine exploration tempo, no major incidents, and steady GOI liaison and BSL operations.
steady exploration tempo
no public exposure
standard GOI interactions
🚨
Minor Incident
$5.0M/yr
Localized breach, minor public exposure or a small-scale legal/PR issue requiring extra response, settlements, and increased missions.
public discovery of a returned 'naked' party
small media leak
minor legal settlement
🚨
Major Breach
$9.8M/yr
Significant containment failure or biological/large-scale exposure requiring mass quarantine, large legal/PR operations, and potential rapid lab scale-up.
mass casualties or widespread exposure
BSL-level pathogen discovery
major public/political exposure
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#2] On-site visible deterrence and shift coverage (3 shifts) for the eatery access point. |
| Rapid Response / Tactical Team | 8 | [#7] On-call extraction and breach response team with medics and tactical equipment. |
| Embedded Agent (Local Law Enforcement Liaison) | 4 | [#3] Foundation operatives embedded in local police/sheriff offices to effect arrests and provide cover. |
| Research Scientist | 4 | [#11, #16, #13] Scientists for xenobiology, sample processing, ecological study and artifact analysis. |
| Medical Officer / Decon | 2 | [#10] Medical and decontamination staff for returned explorers and quarantine readiness. |
| Engineer / Maintenance | 2 | [#6, #23] Structural, HVAC, generator and sensor maintenance personnel. |
| Administrative Staff / Program Management | 3 | [#27, #4] Program managers, legal liaison support, accounts and oversight staff. |
| Site Director / Executive Staff | 1 | [#27] Senior oversight and authorization authority for exploration and GOI interaction. |
Confidence Notes
Estimates are low confidence due to wide ranges in analyst notes, uncertain biological risk (BSL level unknown), potential for high-cost GOI demands, and the anomalous/unpredictable nature of SCP-4390 which can dramatically change requirements.