SCP-440
Euclid
~
medium confidence
SCP-440
Expected annual
$4.8M
One-time setup
$11.5M
Annual recurring
$4.8M
Personnel
17
One-time setup costs are dominated by dome refit, instrumentation, and a contingency reserve (~$11.5M), while recurring annual costs are driven by cleared staff wages, monitoring, maintenance, and hazardous-disposal contingencies (~$4.8M/yr).
One-Time Capital Costs
Total: $11.5M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal year with no containment incidents; routine operations, staffing, maintenance, monitoring, and disposals.
no_incident
routine_operations
🚨
Minor Incident
$5.1M/yr
Small localized release or handling incident requiring temporary lockdown, additional overtime, emergency decontamination and limited remediation.
localized_release
tooling_contamination
limited_population_escape
🚨
Major Breach
$6.8M/yr
Containment breach with significant on-site spread requiring large-scale vitrification/incineration, extended remediation, external contractors and publicity-containment.
breach_during_transfer
equipment_failure
unexpected_ecosystem_growth
🚨
Catastrophic Breach
$24.8M/yr
Large-scale off-site contamination requiring regional remediation, evacuation, long-term environmental remediation and major reserve drawdown.
wide_area_release
failure_of_multiple_containment_layers
public_exposure
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] 24/7 cleared armed security presence (6 guards on-site per 24-hour period as-stated). |
| Research Scientist | 6 | [#4] Xeno/ecology and materials researchers (senior + junior scientists). |
| Technician / Animal Tech | 4 | [#4, #5] Technical staff and animal/containment technicians for husbandry, handling and monitoring. |
| Site Manager / Executive Staff | 1 | [#4] On-site manager responsible for operations and liaison with higher command. |
Confidence Notes
Estimates are assembled from analyst ranges and midpoints; many items have wide ranges (e.g., containment refit, vitrification, contingency reserve) and uncertain incident probabilities, so totals are approximate but grounded in the provided notes.