SCP-4746
Euclid
~
medium confidence
SCP-4746
Expected annual
$3.0M
One-time setup
$5.8M
Annual recurring
$2.9M
Personnel
15
Initial capital expenditures are approximately $5.83M driven by facility build-out, secure IT/monitoring, R&D lab setup, robotic systems and a seeded emergency reserve; recurring annual costs are roughly $2.935M driven primarily by specialized personnel, intelligence/counter-surveillance, and emergency/reserve replenishment.
One-Time Capital Costs
Total: $5.8M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal operational year with no major containment incidents; recurring costs only.
no incidents
routine maintenance
normal staff turnover
🚨
Minor Incident
$3.2M/yr
Localized incident requiring limited MTF response, targeted amnestic administration and small repairs.
partial protocol breach
single-person exposure
minor equipment damage
🚨
Major Breach
$3.9M/yr
Significant containment breach requiring large-scale site quarantine, replacement of equipment and broad amnestic administration.
multi-person exposure
facility damage
public exposure risk
🚨
Catastrophic Breach
$7.9M/yr
Widespread exposure or deliberate external exploitation requiring full crisis operations, rebuild and extensive legal/cover operations.
mass exposure
targeted external attack
loss of site control
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Memetics Specialist | 2 | [#7] Specialized memetic resistance and countermeasure staff included in payroll estimate. |
| Security Officer / MTF Agent | 8 | [#7] On-site security with memetic training (6–8 estimated; using upper-range staffing for redundancy). |
| Site Director / Executive Staff | 1 | [#7] Site lead included in staffing payroll. |
| Medical Officer | 1 | [#7] Medical officer for amnestic administration and emergency care. |
| Psychologist | 1 | [#7] Psychologist for screening, debriefing and ongoing staff mental health. |
| Research Scientist | 2 | [#7] Researchers focused on memetic R&D and countermeasure development. |
Confidence Notes
Analyst notes provide detailed line-item estimates for both capital and recurring costs, yielding moderate confidence; uncertainty remains around frequency of transports/incidents, potential scale-up if novel R&D is required, and unpredictable anomaly-driven escalation.