SCP-4820
Unknown
~
medium confidence
SCP-4820
Expected annual
$2.2M
One-time setup
$2.0M
Annual recurring
$2.2M
Personnel
10.4
One-time startup costs are approximately $2.0M driven by containment upgrades and laboratory capital equipment; annual recurring costs are approximately $2.175M driven by security and medical staffing plus sustained high-cost research and consumables.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal, uneventful year with routine containment, research, and maintenance.
routine_research
scheduled_maintenance
🚨
Minor Incident
$2.3M/yr
Small containment-related incident requiring localized repairs, overtime, temporary medical response, and a transfer to hospital OR.
localized_breach
emergency_surgery
temporary_repair
🚨
Major Breach
$3.2M/yr
Significant containment breach or security failure requiring large-scale repairs, full incident response, legal exposure, and extended research suspension.
major_security_failure
infrastructure_damage
legal_investigation
🚨
Research Scale Up
$2.7M/yr
Deliberate ramp-up of neutralization / high-throughput research requiring additional staff, outsourcing, and trial-level spending.
neutralization_trials
scale_up_funding
Personnel
10.4 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#3] 8 FTE armed guards (3 shifts coverage with relief); wage component included in staff_wages ($440k/yr). |
| Medical Officer (Registered Nurse) | 1 | [#4] 1 FTE RN for daily supervised blood draws and routine care; $80k/yr included in staff_wages. |
| Physician / Surgical Oversight | 0.2 | [#4] 0.2 FTE physician oversight budgeted (~$40k/yr) for larger procedures and oversight. |
| Contract Surgeon (on-call) | 0.2 | [#4] Contract surgical availability budgeted (~$50k/yr); represented as 0.2 FTE equivalent for budgeting purposes (contracted, not full-time). |
| Interpreter / Cultural Liaison | 1 | [#28] 1 FTE interpreter/liaison included (~$30k/yr) to support cultural/linguistic needs of the subject. |
Confidence Notes
Many line items have concrete estimates (security, medical, lab capital, consumables) but SCP anomalous biology and uncertain operational tempo (frequency of surgeries/transfers, scale of neutralization trials) introduce moderate uncertainty.