SCP-4950
Safe
~
medium confidence
SCP-4950
Expected annual
$9.9M
One-time setup
$218.2M
Annual recurring
$9.7M
Personnel
13
One-time capital (vault, pentacular grid, automated exorcists, redundant facility) is dominated by large contingency/reserve allocations; recurring annual costs are driven by security, countercult operations, emergency response, and a continuing reserve contribution. Baseline annual operations are estimated under $10M, while catastrophic mitigation reserves push one-time capital into the hundreds of millions.
One-Time Capital Costs
Total: $218.2M
Annual Recurring Costs
Total: $9.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.7M/yr
Normal year with planned operations, maintenance, and steady countercult activity; no major containment incidents.
steady monitoring
routine maintenance
low cult activity
🚨
Minor Incident
$10.3M/yr
Localized degradation or ritual weakening requiring emergency repairs and targeted countercult action.
grid degradation
localized breach attempts
small-scale cleanup
🚨
Major Breach
$12.7M/yr
Containment breach requiring transfer to redundant facility, replacement of equipment, large cleanup and legal/PR containment.
coordinated cult attack
exorcist failure
significant grid compromise
🚨
Catastrophic Breach
$159.7M/yr
Worst-case coordinated sacrificial campaign or containment failure requiring activation of large-scale mitigation reserves and national/global measures.
nation-scale cult mobilization
simultaneous multi-site attacks
NK-class escalation risk
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Ritual Technician | 2 | Full-time occult/engineering specialists responsible for monitoring the grid and exorcist. |
| Security Officer / MTF Agent | 8 | On-site 24/7 guarded posture across shifts (vetting, armed response). |
| IT / Systems Administrator | 1 | Maintains monitoring stack, secure telemetry, and backups. |
| Site Director / Administrative Staff | 2 | Site management and administrative support for containment and cover operations. |
Confidence Notes
Estimates combine concrete hardware/labor figures with wide-ranging, high-uncertainty contingency allocations (items #23–#24). Recurring operational spending has moderate confidence; catastrophic/long-reserve items carry high uncertainty.