SCP-5102
Euclid
~
medium confidence
SCP-5102
Expected annual
$685K
One-time setup
$613K
Annual recurring
$678K
Personnel
7
Initial containment setup is moderately expensive due to construction, suppression/HVAC, and secure imaging/storage setup (~$613,000 one-time). Ongoing costs are personnel-heavy (researchers, archivist, security) plus maintenance, IT, and preservation, totaling roughly $677,900/year.
One-Time Capital Costs
Total: $613K
Annual Recurring Costs
Total: $678K/yr
Cost Scenarios
📊
Baseline
(baseline)
$678K/yr
Normal year with no major incidents; routine operations, documentation, preservation, and personnel costs only.
routine monitoring
scheduled digitization
no containment incidents
🚨
Minor Incident
$708K/yr
Minor containment issue (equipment failure, small paper-entity event) requiring repairs, targeted forensic work, and short-term PR/legal work.
small equipment failure
localized contamination or minor breach
temporary offline repairs
🚨
Major Breach
$828K/yr
Significant containment breach or public exposure requiring major repairs, incident response, legal defense, and extended PR/cover operations.
public leak of pages
fire or suppression system activation
large-scale media attention
🚨
Research Breakthrough Requiring Scale Up
$878K/yr
Decision/need to actively pursue locating 'Eric' or scale up research operations, prompting special operations and increased research spending.
policy decision to locate 'Eric'
major research opportunity
authorization of field ops
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#9] Two full-time containment researchers (monitoring, experiments, documentation). |
| Archival Technician / Conservator | 1 | [#10] One FTE archival technician or equivalent contracted role for conservation and cataloguing. |
| Security Officer / MTF Agent | 3 | [#11] Three on-site security personnel (rotating coverage for 24/7 presence; mid-range staffing). |
| Administrative Staff / OPSEC liaison | 1 | [#12] Part-time administrative/legal/OPSEC support (represented as one FTE-equivalent for budgeting/liaison work). |
Confidence Notes
Analyst notes provide itemized ranges for almost all line items, enabling a mid-range estimate; remaining uncertainty comes from wide ranges on personnel/pay, contingency/special-ops costs, and unpredictable incident probabilities.