SCP-5256
Euclid
~
medium confidence
SCP-5256
Expected annual
$1.8M
One-time setup
$1.8M
Annual recurring
$1.8M
Personnel
15
Estimated one-time setup costs are approximately $1.79M, with annual recurring operations of roughly $1.80M; main drivers are security and research staffing, antimemetic R&D and specialized equipment, and contingency/emergency reserves.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal operational year with no major incidents; routine research and containment activities only.
normal_operations
scheduled_research
routine_maintenance
🚨
Minor Incident
$1.9M/yr
Localized incident requiring additional amnestics, overtime staffing, limited emergency procurement, and extra medical follow-up.
unplanned_exposure
small_breach
increased_amnestic_administrations
🚨
Major Breach
$3.0M/yr
Significant containment event requiring large-scale emergency response, prolonged surge operations, heavy equipment procurement, and widespread amnestic/legal action.
large_scale_breach
major_public_exposure
extended_removal_attempts
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] On-site guards providing 24/7 presence (6 guards based on analyst estimate). |
| Security Supervisor | 1 | [#4] Shift supervision and scheduling for security staff. |
| Research Lead / Senior Researcher | 1 | [#5] Overall research authorization and experimental oversight. |
| Research Scientist | 3 | [#5] Analysts/researchers performing controlled entries, Hume analysis, and experiments (2–3 estimated; modeled as 3). |
| Research Technician | 1 | [#5, #6] Technical support for instrumentation, sample handling, and experiment setup. |
| Sysadmin / IT | 1 | [#12] Responsible for secure IT, backups, and anti-tamper logging maintenance. |
| Medical Officer | 1 | [#16] Provides recurring health monitoring, medical support, and amnestic administration oversight. |
| Administrative Staff / Liaison | 1 | [#14] Manages cover-story logistics, permits, and local community liaison tasks. |
Confidence Notes
Line-item estimates are detailed and regionally informed, but antimemetic uncertainty, potential for escalation, and metro-adjacent price variability leave material uncertainty; contingency assumptions drive much of the upper-range recurring costs.