SCP-5461
Unknown
?
low confidence
SCP-5461
Expected annual
$3.7M
One-time setup
$2.6M
Annual recurring
$3.6M
Personnel
17
Initial one-time setup is moderate (~$2.6M) driven by secure storage, habitat and R&D/reserve capitalization; ongoing operations are staff-dominated with recurring costs of roughly $3.65M/yr driven by specialist wages, security, medical contracts, research, consumables and reserves.
One-Time Capital Costs
Total: $2.6M
Annual Recurring Costs
Total: $3.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.6M/yr
Normal uneventful year with two-occupant rotations, routine research, maintenance, and no major incidents.
no incidents
routine research and maintenance
🚨
Minor Incident
$4.0M/yr
Single personnel manifesting at fatal/serious fall requiring recovery operation, hospitalisation and targeted cover-up actions.
single fatality or severe injury
one recovery operation
local hospitalisation and cover-up
🚨
Major Breach
$6.8M/yr
Multiple simultaneous casualties or expansion of anomalous activity requiring large-scale recovery, legal settlements and emergency response.
multiple fatalities
large recovery operations
public exposure/legal action
🚨
Research Breakthrough Requiring Scale Up
$4.6M/yr
Discovery of a mitigation approach or containment modification that requires rapid scale-up of R&D and capital investment.
successful mitigation discovery
prototype deployment and scale-up
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Specialist | 10 | [#3] Core specialist/operators staffing the two-person rotation pool (10-person pool assumed). |
| Security Officer / Guard | 5 | [#13] Dedicated site security to protect document and prevent unauthorized ritual performance (4–6 guards; midpoint used). |
| Administrative Staff | 2 | [#15] Scheduling, HR, payroll and clearance maintenance for rotation management (1–2 staff). |
Confidence Notes
The object is anomalous with key unknowns (feasibility and cost of engineering inside SCP-5461-A, true incident frequency, and whether mass-teleport events can occur). Many line items are range estimates and environment-dependent, so overall cost confidence is low.