SCP-5678
Neutralized?1
?
low confidence
SCP-5678
Expected annual
$4.7M
One-time setup
$8.4M
Annual recurring
$4.6M
Personnel
20
Initial capital expenditures are approximately $8.44M driven by archival/vault construction, contingency reserves, insurance and legal cover operations; recurring annual costs are roughly $4.62M driven mainly by staff wages, research grants and ongoing memetic/countermeasure programs.
One-Time Capital Costs
Total: $8.4M
Annual Recurring Costs
Total: $4.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.6M/yr
Normal year with monitoring, staffing, and no major incidents or large emergency operations.
no major containment events
routine monitoring and research only
🚨
Minor Incident
$4.8M/yr
Localized field incident requiring short-term MTF mobilization, targeted forensics and increased surveillance.
short-term field response
contracted forensic engagement
temporary increased surveillance
🚨
Major Incident
$6.1M/yr
Significant at-large anomaly activity or confirmed reality-affecting event requiring black-ops extraction, equipment procurement and rapid containment expansion.
confirmed SCP-5678-2 at-large
covert recovery/neutralization operation
purchase/installation of hardened containment
🚨
Catastrophic Breach
$14.6M/yr
Widespread institutional dissolution or mass records erasure requiring large-scale reconstruction, deployment of reserve funds and mass amnestic remediation.
mass record dissolution
loss of multiple sites or leadership
nation-scale remediation required
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#6] Two principal investigators (Level‑4 clearance) responsible for leading investigation and research. |
| Research Technician / Lab Tech | 4 | [#6] Supporting researchers and technical staff for experiments, evidence processing and lab operations. |
| Security Officer / MTF Agent | 10 | [#7] Full-time security staff and armed response unit providing site security and expanded shift coverage. |
| Engineer / Maintenance | 2 | [#15, #18] Engineers for containment hardware, generators and facility maintenance. |
| Administrative / CI Staff | 2 | [#13, #19] Counterintelligence and administrative staff for investigations, cross-credentialing and redundancy management. |
Confidence Notes
Estimates have low confidence due to contradictory dossier details, wide cost ranges in analyst notes, uncertainty whether the anomaly exists or is reality-altering, and large scenario-dependent one-off expenses.