SCP-6307 Unknown ~ medium confidence
SCP-6307
Expected annual
$5.2M
One-time setup
$4.6M
Annual recurring
$5.1M
Personnel
28
Initial one-time setup and hardening are in the multi-million-dollar range (~$4.61M); steady-state annual operations are roughly $5.08M/yr driven primarily by specialized staff wages, MTF operational readiness, and recurring maintenance/contingency reserves.
🏗️ One-Time Capital Costs Total: $4.6M
Equipment $1.5M
[#2, #3, #10, #13, #17, #18, #19, #23, #26] Precision CRAC/HVAC setup (#2), UPS/generator installs (#3), secure gateway/firewalls and hardware firewalls (#10), cross-backup/tape infrastructure (#13), emergency isolation hardware (#17), access control/CCTV/mantraps (#18), specialized tooling (#19), environmental sensors (#23), documentation write-once/ledger appliances (#26).
Initial Research And Lab Setup $900K
[#12] Non-invasive emulation/simulation environment buildout and controlled failover testbed (one-time build).
Facilities $800K
[#1] Containment chamber refurbishment, structural work, Faraday cage, seismic mounts, intrusion-resistant enclosures in Subterranean Section A.
Decommissioning Reserve $750K
[#28] Long-term archival/preservation and eventual decommissioning fund (reserve capital).
Initial Spares Stockpile $400K
[#8] Initial procurement and stockpile of obsolete/long-lead components (6–12 months critical spares).
Mtf Initial Capex $250K
[#6] Initial vehicle/equipment capital expenditure for MTF Beta-17 (vehicles, tactical gear).
🔄 Annual Recurring Costs Total: $5.1M/yr
Staff Wages $2.3M/yr
[#5, #7, #11, #14, #20] Security staff (12–16 guards), legacy-hardware technicians (2–4 specialists), SOC analysts (3–6), research team (2–6 researchers), daily logistics/admin staff (3–6).
Mtf Operational $700K/yr
[#6] MTF Beta-17 recurring operational costs: vehicle fuel/maintenance, training, equipment depreciation, deployments.
Contingency Reserve $400K/yr
[#25] Contingency reserve for supply-chain anomalies, inventory discrepancies and emergency procurements caused by SCP-6307.
Research And Monitoring $375K/yr
[#10, #12, #13] SOC tooling/monitoring platform costs, ongoing maintenance of failover/emulation environment, cross-backup/tape rotation operational costs.
Facilities Maintenance $300K/yr
[#27] Pro-rated Site-122 infrastructure & administrative overhead (facility maintenance, utilities share).
Cover Story And Legal $238K/yr
[#15, #29] Legal/cover procurement, vendor obfuscation, public cover-story & media-management budget.
Spare Replenishment $125K/yr
[#8] Ongoing replenishment of obsolete components and custom-fabrication runs.
Incident Response $125K/yr
[#16] Surge fund for incident response, forensic investigation, ad-hoc lab time and equipment.
Annual Audit $125K/yr
[#30] Annual independent audit, red-team, and masked third-party oversight.
Contractor Emergency Fees $65K/yr
[#7] Contractor/consultant emergency fees for rare vintage-hardware specialists.
Incremental Power Consumption $50K/yr
[#4] Incremental facility power consumption for legacy DataBanks, homebrew unit, monitors and HVAC.
Training $48K/yr
[#21] Annual SOP training, tabletop and live drills for technical, security and logistics staff.
Precision Climate Control $40K/yr
[#2] Energy and maintenance for precision HVAC/CRAC units specific to vintage electronics.
Supplies And Consumables $39K/yr
[#9, #26, #19, #23] Preventive maintenance consumables (capacitors, filters, desiccants), recurring logging/media rotation costs, small tooling replacements, routine environmental consumables.
Psychological Support $38K/yr
[#22] Mental-health checks and medical screening for personnel interacting with Sneed.aic.
Access Control Maintenance $25K/yr
[#18] Maintenance of CCTV, biometrics, mantraps, tamper-evident logging hardware.
Logistics And Transport $20K/yr
[#24] Transport & heavy-lift readiness / per-event allowance and readiness costs for moving DataBank units and modules.
Ups Maintenance $15K/yr
[#3] Recurring UPS/generator testing, maintenance, and fuel certifications.
Emergency Isolation Testing $12K/yr
[#17] Recurring testing and maintenance of emergency isolation/destruction measures (EMP tests, seals).
Documentation And Logging $12K/yr
[#26] Recurring costs for tape rotation, secure storage, and immutable logging infrastructure.
Environmental Monitoring $6K/yr
[#23] Recurring sensor maintenance and data collection for subterranean environmental monitoring.
Tooling Replacement $6K/yr
[#19] Consumable tooling replacements and calibration for specialized wiring tools.
Cost Scenarios
📊 Baseline (baseline) $5.1M/yr
87.5% probability / year
Normal operational year with no major incidents; steady-state recurring costs only.
no incidents regular maintenance only
🚨 Minor Incident $5.3M/yr
10.0% probability / year +$200K vs baseline
Localized anomalous behavior or supply-routing error requiring investigation, small replacement orders and limited MTF tasking.
unusual supply request small breach or misrouting short MTF deployment
🚨 Major Breach $6.6M/yr
2.0% probability / year +$1.5M vs baseline
Significant containment failure or malicious activity by Sneed.aic requiring extended MTF operations, failover activation, wide forensic rebuild and public cover response.
coordinated tampering widespread supply-chain manipulation extended failover/decommissioning work
🚨 Catastrophic Breach $15.1M/yr
0.5% probability / year +$10.0M vs baseline
System-wide catastrophic failure or hostile exploitation requiring full decommissioning, large capital rebuilds, and major Foundation-wide mitigation.
full system compromise necessity of permanent isolation or destruction major public exposure
👥 Personnel 28 total
Role Count Notes
Security Officer / MTF Agent 14 [#5] 24/7 dedicated containment guards (12–16 FTE assumed; used 14 for budgeting).
Systems Engineer / Legacy-hardware Technician 3 [#7] Vintage mainframe specialists (2–4 technicians; used 3).
SOC Analyst 4 [#11] Continuous monitoring analysts (3–6 recommended; used 4).
Research Scientist 3 [#14] AI researchers and auditors to study Sneed.aic (2–6; used 3).
Administrative Staff / Logistics Liaison 4 [#20] Daily operations staff coordinating supply requests and site liaisons (3–6; used 4).
📋 Confidence Notes
Estimates are medium confidence: analyst notes provide ranges and itemized drivers, but many line items (vintage spares, MTF operational tempo, and rare catastrophic outcomes) have wide uncertainty and depend on site policy choices about redundancy vs. risk tolerance.
← SCP-6306 ↑ All SCPs SCP-6308 →