SCP-6624
Unknown
~
medium confidence
SCP-6624
Expected annual
$5.6M
One-time setup
$38.2M
Annual recurring
$5.5M
Personnel
28
One-time capital and remediation costs are dominated by the construction and modification of Provisional Containment Site‑84 and related archaeological mitigation (~$38.2M). Annual operating costs (~$5.51M/year) are driven by security and community management, sensor/surveillance operations, and legal/cover-story expenses.
One-Time Capital Costs
Total: $38.2M
Annual Recurring Costs
Total: $5.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.5M/yr
Normal year with no major incidents, recurring operations continue as planned.
no_incident
steady_surveillance
routine_maintenance
🚨
Minor Incident
$6.0M/yr
Localized activation or exposure requiring targeted response, medical care and PR/legal response.
localized_activation
limited_public_exposure
emergency_medical_response
🚨
Major Breach
$8.5M/yr
Widespread activation or loss of cover resulting in multi-site recontainment, mass hospitalization, and major legal exposure.
widespread_activation
multiple_casualties
loss_of_cover
🚨
Political Exposure
$6.5M/yr
Discovery or credible leak leading to prolonged legal/diplomatic response and expensive remediation efforts.
credible_leak
heritage_state_intervention
protracted_legal_dispute
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#6] Armed/covert guards and plainclothes operatives assigned to perimeter and covert monitoring (12–20 estimated in notes). |
| Site Director / Executive Staff | 1 | [#7] Senior management for site coordination included in core staff wages. |
| Administrative Staff | 1 | [#7] Administrative personnel for operations, scheduling and liaison duties. |
| Operations Lead | 1 | [#7] Technical/operations lead coordinating on-site activities and incident response planning. |
| Research Scientist / Engineer | 3 | [#7] Analysts and engineers for monitoring, data analysis, and subterranean systems maintenance. |
| Rapid Response / Tactical Team | 6 | [#17] Tactical containment team members (salaries/training included in staff_wages recurring and equipment one-time). |
Confidence Notes
Estimates are order-of-magnitude midpoints from analyst ranges; many costs depend on town size, archaeological requirements, and political risk. Neutralized status reduces uncertainty relative to active anomalies but historical sunk costs and potential political exposure introduce moderate uncertainty.