SCP-6625
Unknown
?
low confidence
SCP-6625
Expected annual
$5.2M
One-time setup
$13.2M
Annual recurring
$4.0M
Personnel
8
Per-instance initial capital (chamber + site-share of equipment/R&D/reserves) is approximately $13.17M with major drivers being reinforced chamber construction, contingency/reserve allocation and specialized R&D; baseline annual operations (security, staff, utilities, monitoring, cover-up) are ~ $4.00M per year.
One-Time Capital Costs
Total: $13.2M
Annual Recurring Costs
Total: $4.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.0M/yr
Normal operational year with no major containment incidents; routine maintenance, staffing, monitoring and cover-up activities only.
no containment failures
routine monitoring and analysis
standard personnel rotations
🚨
Minor Incident
$4.5M/yr
Limited containment anomaly requiring local repairs, MTF response, amnestic deployment and short-term data/sample recovery.
small structural breach
localized sensor/monitor damage
limited civilian exposure requiring amnestics
🚨
Major Breach
$19.0M/yr
Significant containment failure requiring chamber rebuild, heavy salvage, prolonged MTF operations, large-scale amnestic/cover-up and site-level repairs.
major structural failure
large debris/mass redistribution
prolonged public exposure / extensive amnestic operations
🚨
Catastrophic Breach
$34.0M/yr
Catastrophic uncontrolled mass/energy generation or analogous event causing site-level destruction, long-term remediation, relocation and extreme cover-up measures.
unbounded mass/energy increase
site-wide structural collapse
major public exposure / national-level response
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#11] Typical continuous guard coverage model: six guards assigned per chamber (2 per shift × 3 shifts). |
| Research Scientist | 1 | [#12] Pro-rated share of site-pooled scientific staff (4–8 FTEs pooled at site; per-instance allocation assumed). |
| Engineer / Maintenance | 1 | [#13] Pro-rated technical/maintenance staff to support HVAC, containment systems and robotics (2–4 FTEs site-pooled; per-instance allocation assumed). |
Confidence Notes
Estimates use midpoints of wide ranges given in analyst notes and assume a bounded, engineering-manageable transformation range and a 6-instance-per-site pro-rata allocation. Critical uncertainty remains over the true upper bound of SCP-6625's mass/volume/energy changes — if transformations are unbounded estimates become invalid and costs effectively unbounded.