SCP-6711
Unknown
~
medium confidence
SCP-6711
Expected annual
$1.9M
One-time setup
$2.4M
Annual recurring
$1.8M
Personnel
13
Estimated one-time setup costs are dominated by secure facilities, contingency reserves, and specialized hardware/software; recurring annual costs are dominated by staff wages, ongoing monitoring/safety operations, and legal/cover/insurance. One-time ≈ $2.38M; recurring ≈ $1.83M/yr.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal, uneventful year with standard operations, monitoring, and maintenance; no major incidents or public exposure.
routine_operations
scheduled_updates
no_breach
🚨
Minor Incident
$2.0M/yr
Limited containment incident or data exfiltration requiring incident response, targeted remediation, temporary hires, extra legal/PR actions and equipment replacement.
limited_exfiltration
staff_exposure
sandbox_violation
🚨
Catastrophic Breach
$6.8M/yr
Major containment failure or public exposure with timeline/real-world cascading effects requiring large-scale mitigation, mobilization of contingency funds, national coordination, and long-term remediation.
full_exfiltration
public_exposure
timeline_instability
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Senior Anomalous Researcher | 1 | [#8] Lead researcher responsible for project oversight and anomalous analysis. |
| Research Analyst | 2 | [#8] Analysts performing day-to-day analysis and documentation. |
| InfoSec Engineer | 1 | [#8] Responsible for air-gap integrity, SIEM, HSM integration and secure tooling. |
| System Administrator | 1 | [#8] Maintains servers, backups, and hardware. |
| Staff Psychologist / Behavioral Analyst | 1 | [#8] Ongoing psychological monitoring and support for exposed staff. |
| Security Officer / Guard | 6 | [#9] 24/7 coverage across shifts for the secure facility. |
| Security Supervisor | 1 | [#9] Supervises security personnel and coordinates rapid response. |
Confidence Notes
Estimates are built from analyst-provided ranges and a defensible posture (secure facility + staffed team). Significant uncertainty remains due to the object's information/temporal nature and the open-ended worst-case contingency; cost ranges reflect this uncertainty.