SCP-6816
Anomalous
~
medium confidence
SCP-6816
Expected annual
$105K
One-time setup
$89K
Annual recurring
$102K
Personnel
3
One-time program setup costs are modest (~$89k) for IT tagging, pilot monitoring, supplies, training and a small escalation reserve; recurring annual costs are modest (~$102.5k/yr) driven by part-time research allocation, routine forensic testing and ongoing monitoring/administration.
One-Time Capital Costs
Total: $89K
Annual Recurring Costs
Total: $102K/yr
Cost Scenarios
📊
Baseline
(baseline)
$102K/yr
Normal year with no major incidents; routine monitoring, sampling, and administrative overhead only.
no major discoveries
routine sampling and admin
🚨
Minor Incident
$106K/yr
Small stash discovered during renovation or localized accumulation requiring removal and minor remediation.
small stash discovered during construction
localized remediation and disposal
🚨
Major Discovery During Renovation
$132K/yr
Large stash discovered that halts contractor work, requires hazard assessment, extended removal and remediation.
large hoard found
work stoppage and extended remediation
🚨
Research Scale Up Instrument Purchase
$302K/yr
Decision to purchase dedicated forensic instrumentation / scale up local testing capacity in a single year.
programmatic escalation
purchase of dedicated instruments (FTIR, GC-MS)
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | 0.1 FTE allocation to SCP-6816 investigation (budgeted at ~$20k/yr under staff_wages) [#2]. |
| Research Analyst / Data Analyst | 1 | 0.1–0.2 FTE equivalent for pattern-search and data analysis (budgeted within research_and_monitoring at ~$22.5k/yr) [#11]. |
| Administrative Staff | 1 | Cross-site reporting and procurement reconciliation/admin time (budgeted under administrative_overhead and inventory_reconciliation) [#8, #18]. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a mid-confidence estimate; uncertainty remains around site count scaling, optional instrument purchases, and frequency/severity of renovation discoveries, so figures use conservative midpoints and explicit optional/zero-baseline choices.