SCP-6818
Safe
~
medium confidence
SCP-6818
Expected annual
$1.1M
One-time setup
$724K
Annual recurring
$1.0M
Personnel
11
One-time setup costs are approximately $724,500 for containment fit-out, equipment, and initial reserves; recurring annual costs are approximately $1,039,000/yr driven primarily by staffing, insurance/benefits, research activity, and long-term population management.
One-Time Capital Costs
Total: $724K
Annual Recurring Costs
Total: $1.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.0M/yr
Normal year with routine operations, no major incidents.
no incidents
routine research activity
steady population maintenance
🚨
Minor Incident
$1.1M/yr
Localized escape/behavioral incident requiring capture, investigation, and temporary quarantine/replacement.
individual 6818-BIO escape or aggressive modification
targeted veterinary emergency
small-scale external forensic testing
🚨
Major Breach
$1.4M/yr
Significant containment breach or cascading specimen loss requiring large-scale response, legal/cover remediation and possible facility repairs.
multiple specimen loss
extended investigation and public exposure risk
large-scale euthanasia/disposal and replacement
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Head Researcher | 1 | Head researcher responsible for test approvals and oversight. [#5] |
| Research Technician | 2 | Laboratory technicians handling daily experiments and sample processing. [#5] |
| Veterinarian / Veterinary Consultant | 1 | Exotic vet contract for routine and emergency care (counted as 1 FTE-equivalent contractor). [#5, #8] |
| Animal Caretaker | 2 | Daily husbandry and enrichment for 6818-BIO population. [#5, #7] |
| Security Officer / MTF Agent | 5 | Rotating 24/7 security coverage (midpoint of 4–6 personnel). [#6] |
Confidence Notes
Analyst notes provide detailed line items and ranges; however wide ranges for many items (research intensity, security posture, incident frequency and whether a transport vehicle is purchased) create material uncertainty in final estimates.