SCP-7042
Unknown
~
medium confidence
SCP-7042
Expected annual
$2.5M
One-time setup
$1.7M
Annual recurring
$2.4M
Personnel
15
Initial capital outlay is driven by construction of a Wilderness Observation Chamber and modular containment purchases plus transport vehicles and specialized equipment (~$1.65M one-time). Ongoing annual costs are dominated by staff wages (security, vets, researchers) and recurring research/operational budgets (~$2.38M/yr), with meaningful additional risk of multi-hundred-thousand to million-dollar spike events.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal year with steady testing, occasional transfers, and routine operations with no major containment incidents.
routine_testing
scheduled_transfers
no_mass_spike
🚨
Minor Incident
$2.7M/yr
Moderate containment incident or small spike in instance count requiring MTF mobilization, extra veterinary care, temporary rentals and legal/cover expenditures.
single moderate breach
localized mass-creation (dozens)
legal/PR engagement
🚨
Major Spike Event
$3.8M/yr
Large-scale mass-creation or a breach leading to dozens–hundreds of instances, extensive containment, widespread transfers, major legal/PR and public exposure mitigation.
mass-creation (100+ instances)
major breach requiring extended MTF operations
public exposure / legal settlements
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Six security personnel to provide 24/7 chamber observation in three 8-hour shifts (note #4). |
| Research Scientist | 3 | [#10] Core research staff studying ecology/genetics/containment biology (note #10 staffing estimate). |
| Technician / Lab Assistant | 1 | [#10] Postdoc/technical support for research and lab operations (note #10). |
| Veterinarian | 1 | [#6] One full-time veterinarian for exotic species care (note #6). |
| Veterinary Technician / Animal Handler | 2 | [#6] Two vet techs/animal handlers for day-to-day care and procedures (note #6). |
| Administrative Staff / GOI Liaison | 1 | [#16] Administrative liaison to manage transfers/contractual relations with GOI-466 and permits (note #16). |
| Data Manager / IT Specialist | 1 | [#23] One staffer to manage secure recordkeeping, encrypted backups and sequencing data retention (note #23). |
Confidence Notes
Analyst notes provide specific line-item ranges for most costs so baseline recurring and one-time capital estimates are fairly well-grounded; however large-event/mass-creation frequency and magnitude remain uncertain, so scenario probabilities and spike-cost magnitudes retain moderate uncertainty.