SCP-7274
Unknown
~
medium confidence
SCP-7274
Expected annual
$15.3M
One-time setup
$3.4M
Annual recurring
$15.2M
Personnel
21
Initial capital to outfit a single, fully-hardened containment chamber and research/lab capabilities is approximately $3.39M one-time; ongoing annual operations are about $15.2M/yr driven primarily by MTF readiness, multi-year R&D, staffing, and a large catastrophic-response reserve.
One-Time Capital Costs
Total: $3.4M
Annual Recurring Costs
Total: $15.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.2M/yr
Normal uneventful year with routine operations, no breakout or major incidents.
no breakout events
routine research progress
standard MTF readiness
🚨
Minor Incident
$15.8M/yr
Localized breakout or containment incident causing limited structural damage, a few casualties and localized response.
small breakout within site
limited structural/decon needs
minor public exposure requiring local cover-up
🚨
Major Breach
$19.3M/yr
Significant breach affecting multiple areas, requiring large repair works, sustained MTF deployment and substantial cover-up actions.
multi-room breakout
extensive structural damage
multiple casualties and public exposure
🚨
Catastrophic Breach
$65.2M/yr
Large urban breakout or public incident causing mass casualties, infrastructure damage, prolonged national-level response and major cover-up operations.
escaped instances into public
mass-casualty event
major infrastructure damage / nationwide exposure
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#8] Two-person minimum coverage for 24/7 shifts; 6–8 FTE recommended, midpoint used. |
| Medical Officer | 4 | [#9] 2–4 medics plus 1–2 on-call trauma surgeons; staffing chosen to cover immediate response and on-call surgical needs. |
| Research Scientist | 6 | [#10] Core parasitology/pathology/biochemistry research staff (2–6 range; upper-mid chosen to reflect active R&D program). |
| Research Technician | 4 | [#10] Lab technicians and sample management staff to support researchers and lab operations. |
Confidence Notes
Estimates use midpoint values from analyst ranges and explicit per-item notes. Many items (MTF readiness, catastrophic reserve, R&D scope) have high uncertainty and wide ranges; costs are therefore best-estimate rather than high-confidence.