SCP-7414
Safe
~
medium confidence
SCP-7414
Expected annual
$1.4M
One-time setup
$2.5M
Annual recurring
$1.4M
Personnel
13
Initial one-time setup is approximately $2.52M, driven mainly by land control, facility buildout, archive suppression, and contingency reserves. Recurring annual costs are about $1.41M/yr, driven by staff wages (security + researchers), cover/legal/PR operations, logistics/rapid-response, and ongoing monitoring/storage.
One-Time Capital Costs
Total: $2.5M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with no major incidents; routine operations, monitoring, and maintenance only.
no_incidents
routine_maintenance
scheduled_research
🚨
Minor Incident
$1.6M/yr
Single civilian exposure or small media leak requiring rapid response, medical/amnestic deployment, PR/legal action, and limited repairs.
civilian_exposure
single_rapid_response_activation
small_media_leak
🚨
Major Breach
$3.4M/yr
Large-scale exposure or political inquiry requiring emergency land purchase/hardening, large legal/PR payouts, major relocation/hardening, and prolonged investigation.
mass_exposure
government_inquiry
facility_hardening_or_relocation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#6] 24/7 guard coverage (three shifts) to prevent civilian approach; local hires or Foundation security. |
| Research Scientist | 4 | [#12, #13] Archaeologist/runologist/anthropologist/psychologist team (3–5 FTE equivalent) conducting study and remote documentation. |
| Site Director / Executive Staff | 1 | [#4, #2] On-site manager responsible for operations, liaison with legal/cover teams, and overall containment execution. |
| Engineer / Maintenance | 1 | [#10, #11] Responsible for off-grid power systems, vehicles/boats maintenance, and winterization/structural upkeep. |
| Administrative Staff | 1 | [#16, #17] Administrative/cover-role staff to manage fake grants/publications, community payments, and media monitoring coordination. |
Confidence Notes
Estimates are anchored to the analyst's itemized ranges and typical Swedish coastal costs but remain sensitive to site-specific variables (exact parcel price, archive resistance, frequency of tourist visits) and the unpredictable nature of cover/legal expenditures.