SCP-7814
Unknown
~
medium confidence
SCP-7814
Expected annual
$43.4M
One-time setup
$120.2M
Annual recurring
$41.2M
Personnel
195
Initial program setup and physical infrastructure are the dominant one-time costs (~$120M), driven by contingency reserves, research program funding and facility/vault construction; ongoing annual operations are significant (~$41.25M/yr), driven by personnel salaries, ongoing R&D/surveillance and legal/PR/cyber operations.
One-Time Capital Costs
Total: $120.2M
Annual Recurring Costs
Total: $41.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$41.2M/yr
Normal year with no major incidents; routine operations, research, monitoring and maintenance.
no major leaks
routine testing and monitoring
🚨
Minor Incident
$42.8M/yr
Localized leak or limited public exposure requiring targeted response, takedown campaigns, limited covert recovery and legal actions.
localized leak
single-site breach
small media exposure
🚨
Major Breach
$56.2M/yr
Multi-site breach or significant leak that triggers cross-site rapid-response mobilization, larger covert operations, settlements and greater PR/legal effort.
multi-site breach
significant public dissemination
international attention
🚨
Catastrophic Breach
$341.2M/yr
Widespread dissemination or global infohazard/physical propagation causing mass casualties, international crises, large settlements and multi-agency responses.
global dissemination
mass casualties
international diplomatic/military response
Personnel
195 total
| Role | Count | Notes |
|---|---|---|
| Incident Manager / Operations | 7 | [#2] Dedicated incident staffing (6–8 FTE) — midpoint used. |
| Rapid-Response Field Team Members | 48 | [#3, #4] Four regional teams of 12 personnel each (4×12 = 48); salaries/ops included in recurring estimates. |
| Research Scientist | 100 | [#20] Core program staff (75–125 persons) engaged in research, analysis and program administration — midpoint used. |
| Security Officer / Armed Response | 40 | [#21] Security personnel & armed response (30–50 staff) for facilities and vaults — midpoint used. |
Confidence Notes
Analyst notes provide detailed line items but many figures are ranges and several costs (contingency, R&D success, scale of dissemination) are highly uncertain; midpoints were used for planning estimates, so confidence is moderate.