SCP-8203
Euclid
~
medium confidence
SCP-8203
Expected annual
$5.1M
One-time setup
$11.9M
Annual recurring
$4.9M
Personnel
28
Initial setup is dominated by a conditional deep-sea investigation contingency; baseline one-time setup ~ $11.9M (mostly the contingency) with ongoing annual operations ~ $4.87M driven by personnel, maritime operations, legal/PR, and monitoring infrastructure.
One-Time Capital Costs
Total: $11.9M
Annual Recurring Costs
Total: $4.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.9M/yr
Normal year with routine monitoring, no major incidents or extraordinary missions.
routine_monitoring
seasonal_pilgrimage_operations
🚨
Minor Incident
$5.1M/yr
Localized panic or small media exposure requiring emergency PR, additional legal support, and modest compensation/ops.
localized_panic
small_media_exposure
temporary_road_closures
🚨
Major Breach
$6.4M/yr
Large public incident or significant media/legal exposure requiring extended operations, heavy PR/legal response, and compensation.
large_media_breach
extended_public_unrest
major_litigation
🚨
Deep Sea Investigation Attempt
$14.9M/yr
Decision/year in which a funded attempt is made to investigate the reported ~15 km disappearance point with specialized assets.
research_scale_up
specialized_vessel_mission
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Field Agent / Observer | 9 | [#1] Spanish-speaking field surveillance operatives (rotational teams) at ~$120k fully-burdened each. |
| Security Officer / Local Traffic-Control Guard | 14 | [#2] Local contracted guards for road closures and traffic control at ~$40k/yr each. |
| Local Liaison / Cultural Liaison Officer | 1 | [#9] Spanish/Galician-speaking civic liaison to coordinate permits and municipal relations. |
| Research Scientist | 3 | [#15] Parapsychology/anthropology/linguistics researchers studying leaders and procession composition. |
| Administrative Staff / Site Manager | 1 | [#31] Small administrative/site-management role to support field operations and contracting. |
Confidence Notes
Line items and ranges are well-documented for operational costs (personnel, boats, monitoring), but many estimates are wide ranges and the deep-sea contingency is highly uncertain; probabilities and some midpoints are analyst judgments.