SCP-8204
Neutralized
~
medium confidence
SCP-8204
Expected annual
$14.8M
One-time setup
$192.7M
Annual recurring
$13.9M
Personnel
30
Large one-time deep-sea engineering and salvage expenditures dominate costs (survey, ROVs, vessels, permanent stabilization); ongoing annual costs are moderate and driven by specialized staff, vessel charters, ROV maintenance, and monitoring.
One-Time Capital Costs
Total: $192.7M
Annual Recurring Costs
Total: $13.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.9M/yr
Routine year with scheduled inspections, monitoring, and no major incidents.
scheduled_inspections
routine_maintenance
🚨
Minor Incident
$16.9M/yr
Localized structural failure or leak requiring an emergency short campaign and modest repairs.
unexpected_leak
sensor_alert
localized_structural_failure
🚨
Major Breach
$64.0M/yr
Catastrophic collapse, major flooding, or exposure event requiring large salvage, replacement or decommissioning.
catastrophic_collapse
major_flooding
third_party_exposure
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| ROV Pilot / Technician | 6 | Specialized operators for deep-rated ROVs/AUVs; mapped to staff_wages [#12]. |
| Marine Crew / Vessel Operators | 8 | DP vessel crew, deckhands and vessel support; mapped to staff_wages [#12]. |
| Research Scientist | 4 | Scientists and analysts for sample work and anomaly study; mapped to staff_wages [#12]. |
| Engineer / Maintenance | 4 | Mechanical/electrical engineers for ROVs, pumps, and structural work; mapped to staff_wages [#12]. |
| Safety Officer / Medic | 2 | Hyperbaric medicine and safety oversight for deep operations; mapped to staff_wages [#12]. |
| Project Manager / Administrative Staff | 2 | Program management, logistics coordination; mapped to staff_wages [#12]. |
| Security Officer / MTF Agent | 2 | Security and information containment roles; mapped to cover_story_and_legal [#13,#20]. |
| Data Analyst / Archivist | 2 | Data handling, storage, and archival operations; mapped to data_handling_bandwidth [#16]. |
Confidence Notes
Analyst notes provide detailed technical cost ranges for almost every line item but ranges are wide and deep-sea engineering has high uncertainty; core recurring estimates are better constrained than potential one-time escalations.