SCP-8205
Euclid
~
medium confidence
SCP-8205
Expected annual
$5.8M
One-time setup
$27.2M
Annual recurring
$5.4M
Personnel
34
One-time capital costs are substantial (approximately $22.6M) driven by pipe-containment retrofits, relocation option and contingency reserves; recurring annual costs are ~ $5.36M/yr driven primarily by specialized staff wages, research, security and system maintenance.
One-Time Capital Costs
Total: $27.2M
Annual Recurring Costs
Total: $5.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.4M/yr
Normal operational year with no major incidents; routine maintenance, research and containment staffing only.
no_breach
routine_maintenance
scheduled_research
🚨
Minor Incident
$6.3M/yr
Localized partial egress or municipal-line contact requiring targeted recovery, cleanup, legal response and overtime.
partial_egress_into_municipal_sewer
localized_contamination
targeted_repair_and_cleanup
🚨
Major Breach
$15.4M/yr
Escape into city sewer network or widespread contamination necessitating large-scale remediation, legal settlements, potential temporary relocation and major repairs.
escape_into_city_sewers
widespread_contamination
public_exposure_and_litigation
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Acoustic Operator / Listener | 6 | [#4] Six operators (2 per shift) required 24/7 to validate acoustic alarms; staffing cost included in staff_wages. |
| Security Officer / MTF Agent | 13 | [#5] Armed response and site security (multiple guards per shift plus supervisors); headcount consistent with recurring security budget. |
| Research Scientist | 10 | [#12, #9] Containment researchers, structural engineers and ontokinesis specialists (6–12 suggested; budget supports ~10 FTEs). |
| Medical Officer | 1 | [#14] On-call medical personnel for trauma/decontamination readiness; small recurring staffing allocation. |
| Class-D Personnel | 4 | [#15] Test subjects maintained for experimentation/logistics; recurring costs for housing and supplies accounted separately. |
Confidence Notes
Analyst notes provide detailed line-item ranges for nearly all cost drivers enabling mid-range point estimates, but uncertainty remains around incident frequencies, contingency sizing and the decision to pursue full relocation which creates large variance.