SCP-8660
Thaumiel
~
medium confidence
SCP-8660
Expected annual
$2.0M
One-time setup
$1.5M
Annual recurring
$1.9M
Personnel
10
Year‑1 one‑time setup (refurbishment, contingency reserves, security/equipment, protocol/training) totals about $1.48M; annual operations (staff, maintenance, legal, downstream containment impacts) roughly $1.90M/yr driven chiefly by research staffing and increased downstream containment costs, partially offset by estimated breach-reduction savings.
One-Time Capital Costs
Total: $1.5M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal, uneventful year with steady rituals, routine maintenance, research operations, and increased acquisitions accounted for.
regular ceremonies
no containment compromise
routine hiring and acquisitions
🚨
Minor Incident
$2.1M/yr
Small containment-related incident or localized staffing crisis requiring forensic handling, extra counseling, short-term legal/PR response and overtime.
isolated fatality or injury during ritual
local investigation / autopsy
short-term PR/legal response
🚨
Major Breach
$3.2M/yr
Containment compromise or catastrophic damage to SCP-8660 or its shrine requiring emergency relocation, heavy legal/cover-up costs, and operational surge.
containment compromise
destruction/damage of artifact
emergency evacuation/relocation
🚨
Political Exposure
$2.9M/yr
Leak or external discovery of ritual/mythostatic framing leading to litigation, public-relations campaign, and extended covert mitigation.
public leak
external religious or civil authority interest
litigation or large-scale media exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| High Priest / Site Director | 1 | [#5] High Priest authorized to conduct rituals; stipend and daily ritual time accounted in staff_wages. |
| Lamentation Priest (designated) | 6 | [#5] Six designated priests performing ceremonies every six days; stipends and lost-productive-time included in staff_wages. |
| Research Scientist / Data Analyst | 3 | [#12] Small interdisciplinary research/analytics team (data scientist, behavioral scientist, project lead) funded in recurring staff_wages and supported by one-time tools. |
Confidence Notes
Individual line items (refurbishment, surveillance, stipends) are reasonably scoped, but large variable drivers (downstream containment impact, contingency/reserve sizing, legal/PR exposure and savings estimate) introduce significant uncertainty; estimates use midpoints and illustrative baselines where the analyst provided scalable formulas.